{"id":1286,"date":"2026-10-01T11:30:19","date_gmt":"2026-10-01T11:30:19","guid":{"rendered":"https:\/\/koitorhardware.com\/?p=1286"},"modified":"2026-10-01T11:36:04","modified_gmt":"2026-10-01T11:36:04","slug":"supplier-change-notification-oem-metal-hardware","status":"publish","type":"post","link":"https:\/\/koitorhardware.com\/ar\/supplier-change-notification-oem-metal-hardware\/","title":{"rendered":"Supplier Change Notification for OEM Metal Hardware Orders"},"content":{"rendered":"<p>Supplier change notification for OEM metal hardware is a buyer-controlled agreement that requires a supplier to disclose a meaningful post-approval change before using it in production. Importers should define the triggers, information required, review owner, and revalidation evidence in writing. The purpose is not to freeze every workshop adjustment; it is to prevent an unreviewed change from altering fit, appearance, durability expectations, installation, packaging, or the approved commercial specification.<\/p>\n<h2>What does supplier change notification mean after sample approval?<\/h2>\n<p>A supplier change notification is a structured notice that tells the buyer what will change, why, when it will take effect, and which approved product or order is affected. It is different from a deviation request, which asks permission to temporarily depart from a requirement, and different from corrective action, which responds to an identified problem. An importer can use a change-notice rule for a bathroom basket, towel rack, shower caddy, or another custom metal product once its drawing, sample, finish, and packing configuration have been approved.<\/p>\n<p>For supplier change notification for OEM metal hardware, the critical reference is the buyer-approved configuration, not a general promise that a factory will keep making the same item. Buyers can identify the exact SKU, sample, drawing revision, and purchase specification that future notices must reference.<\/p>\n<p>Sample approval does not mean that every future decision is automatically approved. The approval establishes a reference point: the physical sample, drawing revision, material and finish description, and agreed package. If a supplier later proposes a new material source, weld route, finish supplier, tool, assembly step, production location, or carton insert, the buyer needs enough information to decide whether the approved product remains equivalent for its intended use.<\/p>\n<p>A useful rule has two levels. First, define changes that always require written notice and approval before implementation. Second, define low-impact adjustments that can be recorded in normal production documentation without a separate approval, provided the approved functional and visual requirements remain unchanged. Buyers should agree on this distinction with the factory; there is no universal change-notice list that fits every metal hardware program.<\/p>\n<p>For Koitor-style drawing- or sample-based OEM work, the buyer and factory can discuss the critical product features during development: overall envelope, support points, wire routing, weld locations, finish appearance, mounting interface, and package protection. That discussion helps make later notices specific. Koitor\u2019s documented customization and metal fabrication context supports this manufacturing-level discussion; this article does not claim that Koitor operates a formal PCN system.<\/p>\n<h2>Which changes should trigger a supplier notice?<\/h2>\n<p>A practical trigger list follows the buyer\u2019s risk: would the change affect a requirement, create a new failure mode, make comparison with the approved sample unreliable, or change the way a buyer receives and sells the item? If yes, require advance notice. A bare phrase such as \u201cprocess improvement\u201d is not sufficient; the supplier should identify the changed condition and the affected products.<\/p>\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Change area<\/th>\n<th scope=\"col\">Example trigger<\/th>\n<th scope=\"col\">Buyer review question<\/th>\n<th scope=\"col\">Possible evidence<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Material<\/td>\n<td>Wire, tube, sheet, fastener, or component source\/specification changes<\/td>\n<td>Could geometry, corrosion expectations, fit, or appearance change?<\/td>\n<td>Revised material description, sample, document comparison<\/td>\n<\/tr>\n<tr>\n<td>Tooling and forming<\/td>\n<td>Tool, fixture, bend sequence, or forming method changes<\/td>\n<td>Are key dimensions and alignment still within the approved drawing?<\/td>\n<td>Updated drawing, first-off sample, dimensional record<\/td>\n<\/tr>\n<tr>\n<td>Welding and fabrication<\/td>\n<td>Join location, sequence, equipment, subcontractor, or finishing route changes<\/td>\n<td>Are joints, distortion, sharp points, and visible surfaces affected?<\/td>\n<td>Sample comparison and focused workmanship review<\/td>\n<\/tr>\n<tr>\n<td>\u062a\u0634\u0637\u064a\u0628 \u0627\u0644\u0633\u0637\u062d<\/td>\n<td>Coating\/plating source, pretreatment, color, gloss, or process route changes<\/td>\n<td>Does the revised surface match the approved finish and buyer criteria?<\/td>\n<td>Side-by-side finish samples under agreed viewing conditions<\/td>\n<\/tr>\n<tr>\n<td>Assembly or mounting<\/td>\n<td>Bracket, suction component, adhesive, fastener, or assembly sequence changes<\/td>\n<td>Does the product mount, assemble, and function as approved?<\/td>\n<td>Fit check, installation review, revised parts list<\/td>\n<\/tr>\n<tr>\n<td>Inspection and location<\/td>\n<td>Inspection method, production location, or key subcontractor changes<\/td>\n<td>Does the change weaken a previously agreed control or traceability link?<\/td>\n<td>Updated flow, control plan, responsible-party record<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u062a\u063a\u0644\u064a\u0641<\/td>\n<td>Carton, separator, bag, insert, protective material, or pack count changes<\/td>\n<td>Could components rub, bend, scratch, or arrive incomplete?<\/td>\n<td>Pack-out sample, carton dimensions, transit review plan<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>This table is a starting point, not a claim that every listed adjustment has equal risk. A new carton print with unchanged dimensions may need a record, while a changed protective insert around polished wire may deserve physical review. Buyers should classify triggers against the actual product, not approve or reject a change based only on its label.<\/p>\n<p>A supplier notice should say whether the current open order, future orders, spare parts, or all SKUs are affected. It should name the first affected lot or planned effective date. If that boundary is unknown, the buyer cannot confidently separate the original approved configuration from the changed one.<\/p>\n<h2>What information should a change notice contain?<\/h2>\n<p>The notice must let a sourcing, quality, and product owner make the same decision without repeatedly asking for basic facts. Buyers can attach a one-page form to the purchase specification or quality agreement. For each proposed change, request:<\/p>\n<p>An effective supplier change notification for OEM metal hardware also identifies whether the proposed change applies to the next order, an order already in process, or a product family. This scope statement helps buyers route the notice and avoids assuming a sample approval applies to every variant.<\/p>\n<ul>\n<li>&#8211; Product name, SKU, drawing revision, and order or lot scope.<\/li>\n<li>&#8211; Current approved condition and proposed condition, described side by side.<\/li>\n<li>&#8211; Reason for the change, including supply interruption, availability, cost, manufacturability, or process improvement where applicable.<\/li>\n<li>&#8211; Affected operations, components, subcontractors, locations, and package elements.<\/li>\n<li>&#8211; Proposed implementation date and the first order\/lot that could contain the change.<\/li>\n<li>&#8211; Risk assessment: affected dimensions, finish, joints, mounting, function, handling, and labeling.<\/li>\n<li>&#8211; Evidence available before approval: revised drawing, component sample, finish swatch, fit check, first-off article, pack-out sample, or focused inspection record.<\/li>\n<li>&#8211; Open questions, limitations, and any temporary containment or segregation proposal.<\/li>\n<li>&#8211; Buyer decision, approver, date, and any conditions that must be met before release.<\/li>\n<\/ul>\n<p>Ask the supplier to provide the delta, not just resend a complete drawing set. A marked drawing, revision table, annotated photograph, or before\/after component list helps the reviewer see what changed. The buyer should preserve the superseded revision while clearly marking it obsolete for new production; keeping both versions without an effective-date rule invites accidental mixing.<\/p>\n<p>For a bathroom storage product, the notice should identify which features are critical to the buyer. A shift in an invisible wire bend may be acceptable if fit and clearance remain within agreement; a shift in the mounting interface or basket width can affect installation or retail returns. A finish-source change may need comparison under a shared viewing method, while a packaging change may be tested with a sample pack-out instead of requalifying the entire product.<\/p>\n<p>The buyer should name a single coordinator but include the people whose acceptance is needed. Procurement can confirm order scope and timing; product engineering can review drawing impact; quality can choose verification; and packaging or logistics can review transit exposure. An approval should state exactly what was accepted and for which SKU, revision, and order range.<\/p>\n<figure class=\"koitor-blog-image\" style=\"margin:28px auto;text-align:center;\"><img decoding=\"async\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-oem-change-review-evidence.webp\" alt=\"OEM bathroom basket sample, drawing, finish swatches, and packaging arranged for supplier change review\" style=\"display:block;width:100%;height:auto;max-width:960px;margin:0 auto;\" loading=\"lazy\" srcset=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-oem-change-review-evidence-18x12.webp 18w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-oem-change-review-evidence-150x150.webp 150w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-oem-change-review-evidence-300x200.webp 300w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-oem-change-review-evidence-768x512.webp 768w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-oem-change-review-evidence-1024x683.webp 1024w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-oem-change-review-evidence.webp 1200w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption style=\"font-size:14px;color:#667085;margin-top:8px;\">Review the proposed change against the buyer-approved sample, specification, finish, and packaging.<\/figcaption><\/figure>\n<h2>How should the buyer choose the right revalidation evidence?<\/h2>\n<p>Evidence should be proportional to the affected feature. Requiring a complete new qualification for every administrative change wastes time; accepting a verbal assurance for a changed mounting or finish interface leaves the buyer unable to verify equivalence. Start with a change-impact review, then select the smallest set of checks that addresses the plausible effect.<\/p>\n<p>A document comparison may be enough when the change is clerical and no physical characteristic is affected. A component sample or finish swatch is appropriate when a material, appearance, or supplier changes. A first-off sample can confirm geometry, fit, assembly, and visible workmanship after a tooling or process change. A pilot quantity may be useful when several operations or package elements interact. A new validation plan may be needed if the change affects a customer requirement, regulatory obligation, safety-related feature, or previously demonstrated performance; the responsible buyer must define the method and acceptance criteria rather than assume an unverified test.<\/p>\n<p>For metal bathroom and home storage hardware, reviewers often separate four questions:<\/p>\n<ol>\n<li>1. <strong>Identity:<\/strong> Is the sample made from the proposed material, process, finish, and components?<\/li>\n<li>2. <strong>Conformance:<\/strong> Does it match the current drawing, approved sample, or agreed acceptance criteria?<\/li>\n<li>3. <strong>Function:<\/strong> Does it fit the intended mounting arrangement and perform the agreed use without a newly introduced interference?<\/li>\n<li>4. <strong>Delivery:<\/strong> Does the changed packing configuration protect the finish and parts through the buyer\u2019s handling and shipment path?<\/li>\n<\/ol>\n<p>Do not infer a performance result from a photo or from the supplier\u2019s statement that a process is equivalent. The buyer can request objective records where the requirement calls for them, but should not ask for unrelated documentation that does not inform the specific change. If the required evidence cannot be produced before the planned date, hold implementation for affected orders or agree in writing on an explicitly limited temporary disposition.<\/p>\n<h2>How can buyers prevent approval gaps on repeat orders?<\/h2>\n<p>The approval gap often sits between a notice and the production floor. The buyer may approve a revised finish sample while the purchase order still cites the old drawing; or the supplier may have approved packaging instructions that never reached the packing station. Close this gap by tying every approved change to the controlled records that people use.<\/p>\n<p>Use a small sequence:<\/p>\n<ol>\n<li>1. Log the notice and identify the affected SKU, drawing, order, and proposed effective date.<\/li>\n<li>2. Compare the proposed condition against the approved configuration and buyer requirements.<\/li>\n<li>3. Decide which functions must review it and what evidence they need.<\/li>\n<li>4. Record approval, rejection, or conditional approval with the exact scope.<\/li>\n<li>5. Update the purchase specification, drawing revision, bill of materials, inspection points, and packaging instructions as affected.<\/li>\n<li>6. Confirm that obsolete copies are removed from new-production use.<\/li>\n<li>7. Identify the first changed lot or carton and retain traceability to the approved notice.<\/li>\n<li>8. Review the first affected delivery against the agreed checks and close any open condition.<\/li>\n<\/ol>\n<p>Change control is not the same as asking the factory to notify the buyer about every internal adjustment. The purpose is to make material changes visible at the buyer-supplier boundary. A buyer can keep a low-friction record for changes that do not affect a characteristic, while requiring prior approval for defined critical features.<\/p>\n<p>The record should be retrievable during reorder review. A PO note that says \u201csame as last time\u201d is weak if \u201clast time\u201d is not connected to a drawing and accepted sample. For a customized wire basket, retain a version-controlled drawing, dated sample approval, agreed finish reference, pack-out requirements, and relevant change decisions together. If a buyer changes a requirement after approval, issue that change through its own controlled revision so the supplier is not asked to guess which instruction takes precedence.<\/p>\n<h2>What mistakes make supplier change control ineffective?<\/h2>\n<p>The first mistake is writing \u201cno changes without permission\u201d without defining what counts as a change. This creates either silence or excessive notices, depending on the supplier\u2019s interpretation. Define triggers by product characteristics and operation, then review the list at RFQ and sample approval.<\/p>\n<p>The second is accepting an informal message without an affected-order boundary. \u201cWe changed to a better material\u201d does not tell the buyer which SKU, lot, or order is affected, what specification changed, or whether production already started. A complete notice needs the proposed effective point and an answer about work in progress.<\/p>\n<p>The third is treating a sample photo as full evidence. Photos can help compare broad appearance, but they may not reveal material identity, hidden interfaces, dimensions, or packaging protection. Use a physical sample, controlled document, or project-specific record when the change affects those properties.<\/p>\n<p>The fourth is approving the change in email but leaving production documents untouched. This can result in a split state where procurement, supplier engineering, inspection, and packing teams work from different revisions. After approval, update every applicable controlled document and communicate the effective revision.<\/p>\n<p>The fifth is asking for blanket requalification or a fixed test after any change. The evidence should address the change\u2019s actual risk. A packaging alteration calls for a packaging review; a drawing correction with no physical effect may need only record control. A more consequential material or mounting change may require sample review or project-specific verification.<\/p>\n<p>The sixth is assuming that no complaint means no process change. A buyer may not yet have detected an effect, and a supplier may make a change for valid business reasons. A transparent notice protects both parties: the buyer can evaluate the impact before the change becomes a dispute, and the factory can document the approved route.<\/p>\n<h3>Buyer checklist: what should an OEM change-notice rule specify?<\/h3>\n<p>Before the next repeat order, an importer or private-label brand can check that its supplier agreement answers the following:<\/p>\n<ul>\n<li>&#8211; Which material, process, subcontractor, location, tooling, finish, assembly, inspection, and packaging changes require advance notice?<\/li>\n<li>&#8211; Which changes require written buyer approval before implementation?<\/li>\n<li>&#8211; What is the minimum notice lead time, and who receives the notice?<\/li>\n<li>&#8211; Does each notice identify the affected SKU, drawing revision, open orders, first changed lot, and proposed effective date?<\/li>\n<li>&#8211; What before\/after information must the supplier provide?<\/li>\n<li>&#8211; Which buyer functions review product, process, finish, mounting, and packaging effects?<\/li>\n<li>&#8211; What evidence is acceptable for each type of change?<\/li>\n<li>&#8211; How are conditional approvals, temporary deviations, rejected proposals, and open orders handled?<\/li>\n<li>&#8211; How will the approved change be reflected in the drawing, purchase order, inspection plan, and package specification?<\/li>\n<li>&#8211; How will the first affected delivery be identified and checked?<\/li>\n<li>&#8211; Where will obsolete revisions and final approvals be retained?<\/li>\n<li>&#8211; What happens if the supplier cannot meet the notice or evidence requirement before the planned production date?<\/li>\n<\/ul>\n<p>A concise rule is easier to follow than a long generic clause. Buyers can begin with the product\u2019s highest-consequence interfaces, then add triggers as new variants or failure modes are identified. When working with a flexible OEM manufacturer, share the rule before quotation or sample approval so the supplier can clarify feasibility, timing, and evidence expectations before commercial commitments are made.<\/p>\n<figure class=\"koitor-blog-image\" style=\"margin:28px auto;text-align:center;\"><img decoding=\"async\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-supplier-change-review-checklist.webp\" alt=\"Visual checklist for sample, material, drawing revision, and packaging changes in OEM hardware\" style=\"display:block;width:100%;height:auto;max-width:960px;margin:0 auto;\" loading=\"lazy\" srcset=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-supplier-change-review-checklist-18x12.webp 18w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-supplier-change-review-checklist-150x150.webp 150w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-supplier-change-review-checklist-300x200.webp 300w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-supplier-change-review-checklist-768x512.webp 768w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-supplier-change-review-checklist-1024x683.webp 1024w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K191-supplier-change-review-checklist.webp 1200w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption style=\"font-size:14px;color:#667085;margin-top:8px;\">Use these change areas to define a practical notice and approval checklist before repeat orders.<\/figcaption><\/figure>\n<h2>Frequently asked questions about supplier change notification<\/h2>\n<h3>Does every supplier process adjustment need buyer approval?<\/h3>\n<p>No. Define which changes can be recorded and which require prior notice or approval. The dividing line should be whether an adjustment can affect an agreed characteristic, traceability, delivery, or customer obligation.<\/p>\n<h3>Is a supplier change notice the same as corrective action?<\/h3>\n<p>No. A change notice is proactive and describes a proposed or planned change. Corrective action investigates and addresses a detected nonconformity or recurring problem. A corrective action can lead to a process change, which may then require change approval.<\/p>\n<h3>Should buyers request a new sample after every change?<\/h3>\n<p>Not automatically. Request evidence that matches the change. A document-only update may not need a new sample; a changed bend, weld, mounting interface, material, or finish may call for a physical sample or focused revalidation.<\/p>\n<h3>Can a buyer approve a change for one order only?<\/h3>\n<p>Yes, if the scope is explicit. Identify the affected product, order or lot, quantity if known, conditions, and whether the approval expires. Do not let a one-time deviation silently become the new permanent specification.<\/p>\n<h3>What should happen if a supplier makes a change without notice?<\/h3>\n<p>Contain the affected scope, establish what changed and when, compare it with buyer requirements, and decide whether the goods can be accepted, reworked, or held. Keep the response factual; determine whether the issue is a specification gap, communication failure, or nonconformance before assigning cause.<\/p>\n<p><!-- CTA heading is the final H2 --><\/p>\n<section class=\"koitor-blog-cta\" style=\"margin-top:42px;padding:28px;border:1px solid #D0D5DD;border-radius:16px;background:#F8FAFC;\">\n<h2 style=\"margin-top:0;margin-bottom:12px;font-size:28px;line-height:1.25;\">Review a Change Before the Next OEM Order<\/h2>\n<p style=\"font-size:16px;line-height:1.7;margin-bottom:20px;\">Share the approved drawing or sample, proposed material or process change, finish requirement, and affected order stage. Koitor Hardware can discuss manufacturability and sample-based review for bathroom and home storage hardware.<\/p>\n<div style=\"display:flex;gap:12px;flex-wrap:wrap;\"><a href=\"https:\/\/koitorhardware.com\/ar\/%d8%a7%d9%84%d8%a7%d8%aa%d8%b5%d8%a7%d9%84\/\" style=\"display:inline-block;padding:12px 20px;border-radius:8px;background:#FF5A1F;color:#ffffff;font-weight:700;text-decoration:none;\">\u0627\u0637\u0644\u0628 \u0639\u0631\u0636 \u0623\u0633\u0639\u0627\u0631<\/a><a href=\"https:\/\/koitorhardware.com\/ar\/%d8%a5%d9%83%d8%b3%d8%b3%d9%88%d8%a7%d8%b1%d8%a7%d8%aa-%d8%a7%d9%84%d8%ad%d9%85%d8%a7%d9%85-%d8%b0%d8%a7%d8%aa-%d8%a7%d9%84%d8%b9%d9%84%d8%a7%d9%85%d8%a9-%d8%a7%d9%84%d8%aa%d8%ac%d8%a7%d8%b1%d9%8a\/\" style=\"display:inline-block;padding:12px 20px;border-radius:8px;border:1px solid #FF5A1F;color:#FF5A1F;font-weight:700;text-decoration:none;\">Discuss OEM Options<\/a><\/div>\n<div class=\"koitor-article-tags\" style=\"display:flex;gap:8px;flex-wrap:wrap;margin-top:18px;\"><span style=\"display:inline-flex;align-items:center;background:#FFF3ED;color:#9A3412;border-radius:999px;padding:6px 12px;font-size:13px;\">\u0625\u0643\u0633\u0633\u0648\u0627\u0631\u0627\u062a \u0627\u0644\u062d\u0645\u0627\u0645 \u0645\u0646 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0645\u0635\u0646\u0639\u0629 \u0644\u0644\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0623\u0635\u0644\u064a\u0629 (OEM)<\/span><span style=\"display:inline-flex;align-items:center;background:#FFF3ED;color:#9A3412;border-radius:999px;padding:6px 12px;font-size:13px;\">\u062a\u062c\u0647\u064a\u0632\u0627\u062a \u0627\u0644\u062d\u0645\u0627\u0645\u0627\u062a \u0627\u0644\u0645\u0635\u0645\u0645\u0629 \u062d\u0633\u0628 \u0627\u0644\u0637\u0644\u0628<\/span><span style=\"display:inline-flex;align-items:center;background:#FFF3ED;color:#9A3412;border-radius:999px;padding:6px 12px;font-size:13px;\">Small Batch OEM<\/span><\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>Supplier change notification for OEM metal hardware helps importers review material, finish, process, and packaging changes before approving repeat production.<\/p>","protected":false},"author":1,"featured_media":1283,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[38,41,39],"class_list":["post-1286","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-quality-control-articles","tag-custom-bathroom-hardware","tag-oem-bathroom-accessories","tag-small-batch-oem"],"_links":{"self":[{"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/posts\/1286","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/comments?post=1286"}],"version-history":[{"count":2,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/posts\/1286\/revisions"}],"predecessor-version":[{"id":1293,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/posts\/1286\/revisions\/1293"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/media\/1283"}],"wp:attachment":[{"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/media?parent=1286"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/categories?post=1286"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/tags?post=1286"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}