{"id":6245,"date":"2026-10-28T06:29:10","date_gmt":"2026-10-28T06:29:10","guid":{"rendered":"https:\/\/koitorhardware.com\/?p=6245"},"modified":"2026-10-28T06:29:39","modified_gmt":"2026-10-28T06:29:39","slug":"rejected-hardware-duty-drawback-evidence-before-return","status":"publish","type":"post","link":"https:\/\/koitorhardware.com\/ar\/rejected-hardware-duty-drawback-evidence-before-return\/","title":{"rendered":"Returning Rejected Hardware from the U.S.: Evidence to Review Before a Duty-Drawback Claim"},"content":{"rendered":"<h2>The short answer<\/h2>\n<p>When imported hardware does not match the approved sample or specification, arrives without the consignee\u2019s consent, or is found defective as of importation, do not rush to return, destroy, repair, or discard it before checking the customs process. A supplier refund or replacement is a commercial remedy; it does not by itself establish eligibility for a U.S. duty-drawback claim.<\/p>\n<p>Before disposition, preserve the entry and duty records, purchase and invoice records, approved specification and sample references, dated inspection evidence, quantity and SKU identification, ownership and claim-right information, and the proposed export or destruction documents. Ask a qualified drawback filer or customs broker to determine the applicable current route and any notice, examination, waiver, or timing requirements. The order matters: under the current rejected-merchandise rules, notice to CBP may need to precede the return to CBP custody so CBP can decide whether to examine the goods.<\/p>\n<p>This guide is an importer\u2019s evidence handoff checklist, not legal or customs advice and not a promise of recovery. Do not assume that a defect was present at importation, that a carrier return label satisfies the customs process, that every duty or fee is recoverable, or that a supplier credit equals a customs refund. Eligibility depends on facts, the applicable statutory route, documentation, timing, and the current regulations.<\/p>\n<h2>Separate the supplier remedy from the customs question<\/h2>\n<p>A rejected shipment can create two related but distinct workstreams.<\/p>\n<ul>\n<li><strong>Commercial resolution:<\/strong> replacement, repair, credit, refund, price adjustment, or another remedy agreed with the supplier.<\/li>\n<li><strong>Customs review:<\/strong> whether the merchandise and facts meet a specific drawback provision, who may claim, what records and notice are required, and what amount\u2014if any\u2014can be claimed.<\/li>\n<\/ul>\n<p>A commercial invoice credit can help document what happened between buyer and supplier. It does not prove which customs route applies or that the claimant has satisfied CBP\u2019s requirements. Likewise, a parcel leaving the United States is not automatically a qualifying export for a particular drawback claim.<\/p>\n<p>For a rejected-merchandise claim under 19 U.S.C. 1313(c), the current regulations address merchandise that does not conform to sample or specifications, was shipped without the consignee\u2019s consent, or was determined defective as of the time of importation, among other specified circumstances. The applicable details differ by scenario. Ask a qualified filer to assess the facts before choosing a route. This article does not determine whether a specific shower shelf, towel bar, wire basket, or other hardware item qualifies.<\/p>\n<p>A common risk is to treat \u201cthe buyer rejected it\u201d as the complete legal test. It is only a commercial description unless the specific legal conditions are satisfied and supported. A product can fail an agreed cosmetic criterion after handling, be damaged in domestic transport, or be affected by storage after importation; those facts may differ from a condition that existed at importation. Preserve observations without making unsupported conclusions about when or why the condition arose.<\/p>\n<figure class=\"wp-block-image size-large koitor-blog-image\"><img decoding=\"async\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-rejected-merchandise-inspection-record.webp\" alt=\"Buyer documenting a rejected hardware inspection against an approved sample and specification\" style=\"width:100%;max-width:960px;height:auto;display:block;margin:0 auto;\"  srcset=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-rejected-merchandise-inspection-record-18x12.webp 18w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-rejected-merchandise-inspection-record-150x150.webp 150w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-rejected-merchandise-inspection-record-300x200.webp 300w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-rejected-merchandise-inspection-record-768x512.webp 768w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-rejected-merchandise-inspection-record-1024x683.webp 1024w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-rejected-merchandise-inspection-record.webp 1200w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" loading=\"lazy\"\/><\/figure>\n<h2>Pause disposition long enough to preserve the evidence<\/h2>\n<p>As soon as a nonconformity is identified, create a product-level evidence file. Use a consistent identifier that connects the order, shipment, supplier SKU, carton or lot, entry, and any return authorization. If the shipment contains multiple models or affected quantities, record each separately.<\/p>\n<h3>Preserve the import and commercial record<\/h3>\n<p>Gather records that can connect the physical goods to the import transaction:<\/p>\n<ul>\n<li>Entry number, entry summary, relevant line identifiers, and broker\/filer reference.<\/li>\n<li>Commercial invoice, purchase order, packing list, and payment or duty records relevant to the transaction.<\/li>\n<li>Supplier SKU, product description, quantity, unit of measure, carton or lot identifiers, and shipment references.<\/li>\n<li>Product specification, drawings, approved sample record, change history, and purchase-order revision.<\/li>\n<li>Any broker or customs documentation used to make the entry.<\/li>\n<\/ul>\n<p>Keep originals in the format received. Do not overwrite an invoice description or add a retrospective note into the original file. If the supplier issues a corrected invoice or credit memo, preserve both versions and record when and why the revision was made.<\/p>\n<p>Do not assume an entry-summary line corresponds one-to-one with a factory SKU. If a broker grouped items or divided invoice lines, ask for the documented mapping and preserve it. This is especially useful where a shipment contains several finishes, fastener packs, or combined retail sets.<\/p>\n<h3>Record the nonconformity precisely<\/h3>\n<p>Write down what was observed, where, when, and by whom. Use photographs with a date and a scale or clear reference when useful. Keep the goods and packaging identifiable until the qualified filer advises whether they must be presented or retained for examination.<\/p>\n<p>Describe observable facts: the supplied bracket hole location differs from the approved drawing; the specified finish is missing on a defined area; a stated quantity is absent from a sealed carton; or a sampled weld is visibly separated. Avoid turning an observation into a cause claim unless an investigation supports it. \u201cThe shelf is defective\u201d is less useful than a dated record naming the inspected SKU, sample size, measured or observed difference, inspection method, and reference specification.<\/p>\n<p>Record the approved basis for comparison. A sample can be useful, but its version, approval date, and relation to production need to be documented. If a drawing or specification changed, retain the relevant revision history and show which version governed the order. A buyer\u2019s memory or an undated photo does not establish the approved requirement.<\/p>\n<p>If damage is suspected after arrival, note the receipt condition, cartons, seals, unloading and storage observations, and any carrier documentation. Do not state that the defect existed at importation unless the available evidence supports that statement. Timing and cause may be disputed or unknown; preserve that uncertainty for the broker or counsel to evaluate.<\/p>\n<h3>Identify what goods will be returned or destroyed<\/h3>\n<p>Before a carrier collects anything, prepare a quantity-level schedule. Connect each item or carton to the entry, product identifier, lot or shipment, and condition record. Photograph labels and packaging before repacking. If only part of a shipment is rejected, identify accepted and rejected quantities separately.<\/p>\n<p>If goods are mixed, repacked, repaired, relabeled, or divided after receipt, document each step, the date, who handled the goods, and what quantity remains. Keep the original packaging when it carries identifiers or may help establish condition. If the goods cannot be held safely, ask the qualified filer and insurer or carrier what action is appropriate before disposing of evidence.<\/p>\n<p>A count sheet should reconcile the quantity received, inspected, accepted, rejected, returned, destroyed, and still held. Use the unit of measure found in each source and show any conversion. This prevents a general \u201cshipment returned\u201d note from obscuring that only a subset was involved.<\/p>\n<h2>Confirm notice and timing before export or destruction<\/h2>\n<p>Under 19 CFR 190.42, a rejected-merchandise drawback claim has a statutory five-year time limit for export or destruction. The provision also requires documentation supporting the applicable rejection basis. It further requires notice to CBP to give the agency an opportunity to examine merchandise. The regulation describes filing CBP Form 7553 at least five working days before the intended return to CBP custody, unless the claimant has a prior-notice waiver or follows the applicable one-time-waiver procedure.<\/p>\n<p>This is why the importer should not book a return shipment, scrap the merchandise, or let a supplier arrange disposal before asking the filer to confirm the sequence. The form, port, location, parties, and timing are fact-specific. The broker or drawback specialist should confirm the current process with CBP and explain whether notice is required, whether a waiver applies, and what to do if an earlier step was missed.<\/p>\n<p>An importer should not interpret \u201cfive working days\u201d as a general permission to ship immediately after five days. CBP may decide to examine the goods. The applicable regulation describes consequences if merchandise is exported or destroyed without being presented after a timely examination notice. Follow the written direction for the transaction and retain communications and proof of the outcome.<\/p>\n<p>If notice was not filed before a prior return or destruction, do not backdate a form or reconstruct a record as if the required notice had occurred. Tell the qualified filer exactly what happened, including dates, and ask whether a permitted procedure remains available. The regulations include provisions addressing certain failures to provide notice, but eligibility depends on their conditions. Do not promise that a late notice can be cured.<\/p>\n<p>For destruction, ask for the applicable procedure and what third-party evidence or CBP supervision is required. A disposal invoice alone may not establish the required facts. For export, retain shipment and export documentation that links the goods to the identified items and transaction. Ask the filer to define which records it needs before booking so the carrier\u2019s documentation can be collected correctly.<\/p>\n<h2>Clarify who owns the claim and who controls the goods<\/h2>\n<p>The buyer should identify every party that owned or possessed the merchandise, any transfer to a supplier, repair center, warehouse, or other party, and who will act as claimant and exporter or destroyer. The regulations specify documentation where the claimant is not the importer, including statements related to other drawback claims and supporting records. The relevant legal framework should be confirmed for the actual chain of ownership and the specific claim.<\/p>\n<p>A return authorization is not the same as a transfer of the right to claim. If the supplier arranges pickup or becomes the exporter, ask the filer to document who is entitled to claim and whether any assignment or certification is required. Do not assume the party that paid the original supplier invoice automatically can file, nor that one party may file without checking whether another has claimed.<\/p>\n<p>Keep roles clear:<\/p>\n<ul>\n<li><strong>Importer or product team:<\/strong> identifies the order, SKU, approved requirement, receipt, defect evidence, affected quantity, and commercial decision.<\/li>\n<li><strong>Supplier:<\/strong> confirms factual production and shipment information within its records and documents any agreed replacement, credit, or return.<\/li>\n<li><strong>Broker or drawback specialist:<\/strong> determines the applicable customs route, notice procedure, claimant requirements, entry data, and claim calculation.<\/li>\n<li><strong>Qualified trade counsel:<\/strong> advises on disputed facts, eligibility, deadlines, legal exposure, and any corrective steps.<\/li>\n<\/ul>\n<p>The importer remains responsible for truthful records and should not sign a statement it cannot support. Escalate unresolved facts rather than filling a gap with an assumption.<\/p>\n<figure class=\"wp-block-image size-large koitor-blog-image\"><img decoding=\"async\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-drawback-export-evidence.webp\" alt=\"Importer reviewing shipment and export evidence with transaction records\" style=\"width:100%;max-width:960px;height:auto;display:block;margin:0 auto;\"  srcset=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-drawback-export-evidence-18x12.webp 18w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-drawback-export-evidence-150x150.webp 150w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-drawback-export-evidence-300x200.webp 300w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-drawback-export-evidence-768x512.webp 768w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-drawback-export-evidence-1024x683.webp 1024w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/10\/K1191-drawback-export-evidence.webp 1200w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" loading=\"lazy\"\/><\/figure>\n<h2>Build a clean document handoff<\/h2>\n<p>Before the filer evaluates the claim, organize the documents around one transaction map. A practical index may include:<\/p>\n<div class=\"wp-block-table koitor-responsive-table\" style=\"max-width:100%;overflow-x:auto;\">\n<table style=\"width:100%;border-collapse:collapse;overflow-wrap:anywhere;\">\n<thead>\n<tr>\n<th>Evidence group<\/th>\n<th>Typical records<\/th>\n<th>Review question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Import entry<\/td>\n<td>Entry and entry-summary records, broker references, duty data<\/td>\n<td>Which imported goods and amounts are being considered?<\/td>\n<\/tr>\n<tr>\n<td>Commercial chain<\/td>\n<td>PO, invoice, packing list, payment, SKU and shipment records<\/td>\n<td>Can the goods be linked to the original transaction?<\/td>\n<\/tr>\n<tr>\n<td>Approved requirement<\/td>\n<td>Drawing, specification, golden sample, revision approval<\/td>\n<td>What exact requirement was not met?<\/td>\n<\/tr>\n<tr>\n<td>Condition evidence<\/td>\n<td>Inspection report, dated photographs, receiving notes, sample\/count data<\/td>\n<td>What was observed and when?<\/td>\n<\/tr>\n<tr>\n<td>Ownership and control<\/td>\n<td>Warehouse receipts, transfers, return authorization, claimant agreement<\/td>\n<td>Who owned, possessed, exported, or destroyed the merchandise?<\/td>\n<\/tr>\n<tr>\n<td>Notice and disposition<\/td>\n<td>Form 7553, CBP response, waiver if applicable, carrier\/export or destruction proof<\/td>\n<td>Was the required process followed and what happened to the goods?<\/td>\n<\/tr>\n<tr>\n<td>Supplier resolution<\/td>\n<td>Credit, replacement, repair, correspondence<\/td>\n<td>What commercial remedy occurred, separate from customs treatment?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Give the filer a factual chronology: entry, receipt, inspection, discovery, notification, storage, decision, notice, CBP response, and disposition. Mark unknown dates as unknown. Do not infer dates from email creation when the event happened at another time.<\/p>\n<p>Ask the filer to state any missing evidence before the goods move. If a record cannot be obtained, document the attempt and ask whether a substitute is acceptable under the current rule. A checklist is not a guarantee of claim acceptance; the filer decides what the claim requires, and CBP may request additional information or examine the goods.<\/p>\n<h3>Keep the recovery estimate conservative<\/h3>\n<p>The regulation describes a maximum drawback amount for rejected merchandise as 99 percent of duties paid with respect to the imported, duty-paid merchandise. This is not a promise that an importer will recover 99 percent of its total outlay. Whether a claim is available, what amount is eligible, which duties or fees may be included, who can claim, and what deductions or limitations apply depend on the facts and applicable provisions.<\/p>\n<p>Do not advertise a supplier credit as a customs refund. Do not multiply a product invoice by a duty rate and call that a claim estimate without having the filer verify the entry, payment, applicable merchandise, and calculation. Customs duties and broker charges are different categories; a drawback payment does not automatically reimburse freight, brokerage, storage, penalties, or all other costs.<\/p>\n<p>If the potential amount is small compared with the cost of collecting evidence or returning goods, discuss the commercial economics with the broker and finance team. That is a business decision, not a reason to skip a required notice or recordkeeping step if the importer chooses to pursue a claim.<\/p>\n<h2>A before-disposition checklist for hardware buyers<\/h2>\n<p>Before approving export, return, or destruction, confirm:<\/p>\n<ul>\n<li>The affected product, SKU, entry, shipment, quantity, and carton or lot are identified.<\/li>\n<li>The governing specification or approved sample and revision are retained.<\/li>\n<li>Dated inspection observations distinguish what is known from what is still uncertain.<\/li>\n<li>The importer has preserved entry, invoice, PO, packing, payment, and broker records.<\/li>\n<li>The supplier\u2019s proposed credit, replacement, or repair is documented as a commercial remedy.<\/li>\n<li>The proposed drawback route and claimant have been reviewed by a qualified filer.<\/li>\n<li>Ownership, possession, exporter\/destroyer role, and any claim assignment are understood.<\/li>\n<li>CBP notice, examination opportunity, waiver, and current timing requirements are confirmed before goods move.<\/li>\n<li>The goods and evidence remain accessible if CBP or the filer needs them.<\/li>\n<li>Export or destruction proof will identify the same merchandise and quantities.<\/li>\n<li>The filer has reviewed the evidence index and any missing records.<\/li>\n<li>No return, destruction, or customs statement has been made based on an unsupported assumption.<\/li>\n<\/ul>\n<h3>FAQs<\/h3>\n<h3>Does a supplier refund automatically return the import duty?<\/h3>\n<p>No. The supplier\u2019s credit or refund is a commercial adjustment. A customs drawback claim has separate eligibility, documentation, timing, and filing requirements.<\/p>\n<h3>Can a buyer return defective hardware right away?<\/h3>\n<p>Before disposition, ask a qualified filer to confirm the applicable route and notice steps. The rejected-merchandise regulation provides for CBP notice and an opportunity to examine goods in specified circumstances. A carrier label or supplier return authorization does not establish that those steps were completed.<\/p>\n<h3>What evidence helps show that hardware did not meet specification?<\/h3>\n<p>Keep the actual approved specification or sample reference, dated inspection results, identified product and quantities, photographs, receipt records, and correspondence. Describe the discrepancy factually and do not claim it existed at importation unless evidence supports that conclusion.<\/p>\n<h3>Is the five-year period a deadline to file the claim?<\/h3>\n<p>The regulation states that drawback is denied on merchandise exported or destroyed after the statutory five-year period. Claim filing deadlines and other requirements are governed by the applicable provisions. Ask the filer to confirm every relevant deadline for the specific transaction; do not treat one period as the only deadline.<\/p>\n<h3>Will a drawback claim reimburse all duties, fees, and shipping costs?<\/h3>\n<p>No general promise should be made. The regulation states a 99 percent maximum of duties paid for rejected-merchandise drawback, subject to eligibility and calculation. It does not mean 99 percent of all transaction costs or guarantee a particular recovery.<\/p>\n<h3>Official references<\/h3>\n<ul>\n<li><a href=\"https:\/\/www.ecfr.gov\/current\/title-19\/chapter-I\/part-190\" rel=\"nofollow noopener\" target=\"_blank\">19 CFR Part 190, Modernized Drawback<\/a>, including \u00a7\u00a7 190.41\u2013190.42 for rejected merchandise, documentation, timing and notice.<\/li>\n<li><a href=\"https:\/\/www.ecfr.gov\/current\/title-19\/chapter-I\/part-190#section-190.42\" rel=\"nofollow noopener\" target=\"_blank\">19 CFR 190.42<\/a> describes the rejected-merchandise procedures and supporting documentation. Confirm the current rule and the facts with a qualified filer.<\/li>\n<\/ul>\n<p><strong>Practical takeaway<\/strong><\/p>\n<p>For a rejected hardware shipment, preserve evidence first and choose disposition only after the customs process is clear. Link the defect to the approved requirement, the goods to the import entry, and the proposed return or destruction to the identified quantity. Confirm notice and examination steps before moving merchandise, and keep the supplier remedy separate from the customs claim.<\/p>\n<p>This handoff gives a broker or drawback specialist the facts needed to determine the correct route without asking the buyer to make a legal conclusion from a few photos or a credit memo. For other buyer-side manufacturing and product specification topics, see <a href=\"https:\/\/koitorhardware.com\/ar\/custom-kitchen-storage-rack-manufacturer\/\">\u062a\u0635\u0646\u064a\u0639 \u0631\u0641\u0648\u0641 \u062a\u062e\u0632\u064a\u0646 \u0645\u062e\u0635\u0635\u0629 \u0644\u0644\u0645\u0637\u0627\u0628\u062e<\/a> \u0648 <a href=\"https:\/\/koitorhardware.com\/ar\/oem-home-storage-hardware-manufacturer\/\">OEM home storage hardware manufacturing<\/a>. To discuss a hardware sample or specification, contact Koitor with the relevant drawing, purchase revision, and nonconfidential product facts.<\/p>\n<h2>\u0627\u0639\u0645\u0644 \u0645\u0639 \u0634\u0631\u0643\u0629 \u00ab\u0643\u0648\u064a\u062a\u0648\u0631\u00bb \u0644\u0644\u0623\u062f\u0648\u0627\u062a<\/h2>\n<section class=\"koitor-blog-cta\" style=\"margin-top:36px;padding:28px;border:1px solid #D0D5DD;border-radius:16px;background:#F8FAFC;\">\n<h3 style=\"margin-top:0;margin-bottom:12px;font-size:28px;line-height:1.25;color:#101828;\">Need Help With a Custom Hardware Project?<\/h3>\n<p style=\"font-size:16px;line-height:1.7;margin-bottom:20px;color:#344054;\">Share a drawing or sample, target market and nonconfidential product requirements. Koitor can discuss supported metal structures and manufacturing feasibility from buyer inputs; product-specific performance, compliance and use claims need evidence for the exact design and market.<\/p>\n<div style=\"display:flex;gap:12px;flex-wrap:wrap;align-items:center;margin-bottom:24px;\">\n    <a href=\"https:\/\/koitorhardware.com\/ar\/%d8%a7%d9%84%d8%a7%d8%aa%d8%b5%d8%a7%d9%84\/\" style=\"display:inline-flex;align-items:center;justify-content:center;min-height:48px;padding:0 22px;border-radius:8px;background:#FF5A1F;color:#ffffff;font-weight:700;text-decoration:none;line-height:1;\">\u0627\u0637\u0644\u0628 \u0639\u0631\u0636 \u0623\u0633\u0639\u0627\u0631<\/a><br \/>\n    <a href=\"https:\/\/koitorhardware.com\/ar\/\" style=\"display:inline-flex;align-items:center;justify-content:center;min-height:48px;padding:0 22px;border-radius:8px;border:1px solid #FF5A1F;color:#FF5A1F;background:#ffffff;font-weight:700;text-decoration:none;line-height:1;\">Explore Koitor Hardware<\/a>\n  <\/div>\n<div class=\"koitor-article-tags\" style=\"margin-top:24px;padding-top:18px;border-top:1px solid #E5E7EB;display:flex;align-items:center;gap:8px;flex-wrap:wrap;\">\n    <span style=\"font-size:14px;font-weight:700;color:#344054;margin-right:4px;\">\u0627\u0644\u0639\u0644\u0627\u0645\u0627\u062a:<\/span><br \/>\n    <span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">\u062f\u0644\u064a\u0644 \u0627\u0644\u0634\u0631\u0627\u0621 \u0644\u0644\u0645\u0633\u062a\u0648\u0631\u062f\u064a\u0646<\/span><br \/>\n    <span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">China Sourcing<\/span><br \/>\n    <span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">Product Development<\/span>\n  <\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>Before exporting or destroying rejected U.S. imports, hardware buyers should preserve entry, defect, ownership, quantity and disposition evidence. This guide separates supplier remedies from customs drawback review and explains why the notice sequence must be confirmed before goods move.<\/p>","protected":false},"author":1,"featured_media":6242,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32],"tags":[335,40,37],"class_list":["post-6245","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-importer-buying-guide","tag-import-compliance","tag-importer-buying-guide","tag-quality-control"],"_links":{"self":[{"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/posts\/6245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/comments?post=6245"}],"version-history":[{"count":1,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/posts\/6245\/revisions"}],"predecessor-version":[{"id":6246,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/posts\/6245\/revisions\/6246"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/media\/6242"}],"wp:attachment":[{"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/media?parent=6245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/categories?post=6245"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/koitorhardware.com\/ar\/wp-json\/wp\/v2\/tags?post=6245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}