{"id":6837,"date":"2026-11-03T00:04:19","date_gmt":"2026-11-03T00:04:19","guid":{"rendered":"https:\/\/koitorhardware.com\/?p=6837"},"modified":"2026-11-14T01:46:26","modified_gmt":"2026-11-14T01:46:26","slug":"supplier-sustainability-questionnaire-evidence-map","status":"publish","type":"post","link":"https:\/\/koitorhardware.com\/de\/supplier-sustainability-questionnaire-evidence-map\/","title":{"rendered":"Supplier Sustainability Questionnaires: An Evidence Map for Hardware Buyers (Supplier Sustainability Questionnaire Evidence)"},"content":{"rendered":"<p>A supplier sustainability questionnaire is useful only when the buyer can tell which company, factory site, product, process and time period each answer covers. For a hardware importer, supplier sustainability questionnaire evidence should therefore be mapped to an owner and a real, relevant record before the answer is treated as a verified fact. A completed form is a record of responses; it is not automatically a site audit, product certification, environmental declaration or proof that every subcontractor follows the same practice.<\/p>\n<p>The practical starting point is a question-level evidence map. It records the exact request, the entity or activity in scope, the responsible person, the document or data source, its date and status, and any limitation that remains. This makes it easier to distinguish \u201csupported,\u201d \u201cpending,\u201d \u201cnot measured\u201d and \u201cnot applicable\u201d without dressing an unknown as a positive answer.<\/p>\n<h2>Start by identifying the scope behind each question<\/h2>\n<p>For this decision, record the supplier sustainability questionnaire evidence requirements in the controlled specification and sample review so the approved scope remains clear to purchasing, quality and the supplier.<\/p>\n<p>Before asking a supplier to complete a questionnaire, confirm whose answers are being requested. A buyer may be evaluating a legal entity, a named production site, a group of locations, a product line, a specific material, or one stage of a supply chain. These scopes overlap, but they are not interchangeable.<\/p>\n<p>For example, a company-level policy may describe an organization\u2019s intention, while a site record may show how one plant controls a process. A product material declaration concerns the composition or attributes of an item under a stated boundary. None of those records automatically proves the others. A head-office answer does not by itself establish what happens at a manufacturing site; a factory procedure does not by itself prove that a particular SKU uses the described material; and a product document may not describe the broader company\u2019s labor or environmental management.<\/p>\n<p>Assessment providers also define scope in provider-specific ways. EcoVadis, for example, describes scope in terms of the legal entity or entities under assessment and the relevant operational sites. Buyers should follow the instructions for the particular questionnaire rather than copy one provider\u2019s definitions into every supplier form. The practical lesson is to name the entity and locations precisely, then ask the supplier to identify where each answer applies.<\/p>\n<p>A scope field should be specific enough to survive a handoff between procurement, quality and sustainability teams. Useful fields include the supplier\u2019s registered or trading name as requested by the buyer, the production site name and address when relevant, the product family or SKU, the process under review, the reporting period, and any named subcontracted operation. If the buyer does not know which level applies, the request should say so and ask the supplier to clarify before the buyer compares answers.<\/p>\n<p>A hardware product may involve forming, welding, polishing, coating, assembly, packaging and purchased components. Those activities may take place in different buildings or through different suppliers. A single answer such as \u201cour factory handles production\u201d can hide distinctions that matter to the buyer. The buyer does not need to assume a problem; the buyer needs enough context to determine whether the answer describes the actual operation being qualified.<\/p>\n<h2>Build a question-level evidence map<\/h2>\n<p>Do not start by collecting a large folder of certificates and asking the supplier to upload everything. Start with each question and decide what evidence would actually support the requested answer. EcoVadis states that supporting documents should be relevant, complete and connected to the scope of an assessment; that is a provider rule, but the underlying evidence discipline is useful for ordinary supplier onboarding too.<\/p>\n<p>A compact evidence map can use these columns:<\/p>\n<div class=\"wp-block-table koitor-responsive-table\" style=\"max-width:100%;overflow-x:auto;\">\n<table style=\"width:100%;border-collapse:collapse;overflow-wrap:anywhere;\">\n<thead>\n<tr>\n<th>Field<\/th>\n<th>Buyer purpose<\/th>\n<th>Example for a hardware supplier<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Question reference<\/td>\n<td>Keeps the answer tied to the original request<\/td>\n<td>Q12: identify the coating process used for this product family<\/td>\n<\/tr>\n<tr>\n<td>Scope<\/td>\n<td>Shows the entity, site, product or activity covered<\/td>\n<td>Named production site and the coating stage for the quoted SKU<\/td>\n<\/tr>\n<tr>\n<td>Reporting period<\/td>\n<td>Prevents an old record from being treated as current<\/td>\n<td>Calendar year, quarter or document issue date requested<\/td>\n<\/tr>\n<tr>\n<td>Evidence owner<\/td>\n<td>Identifies who can confirm the answer<\/td>\n<td>Supplier quality contact, site operations or material vendor<\/td>\n<\/tr>\n<tr>\n<td>Supporting record<\/td>\n<td>Points to the document or system that backs the answer<\/td>\n<td>Current procedure, dated data extract or supplier declaration<\/td>\n<\/tr>\n<tr>\n<td>Status<\/td>\n<td>Separates evidence from gaps<\/td>\n<td>Supported, pending, not measured or not applicable<\/td>\n<\/tr>\n<tr>\n<td>Limitation<\/td>\n<td>Records what the evidence does not prove<\/td>\n<td>Applies to one site; excludes purchased fasteners<\/td>\n<\/tr>\n<tr>\n<td>Confidentiality<\/td>\n<td>Avoids unnecessary circulation of sensitive files<\/td>\n<td>Redacted copy, controlled view or named recipient<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>This structure is more useful than a folder named \u201csustainability documents,\u201d because it lets the buyer see the relationship between a claim and its support. A policy can support the existence of a policy; it may not demonstrate implementation at a particular site. A measurement spreadsheet may support a reported figure, but only if the measurement period, boundary, units and responsible source are clear. A certificate may have a defined scope and validity date that the buyer needs to check.<\/p>\n<p>Supplier answers should not be forced into a false yes-or-no format when the evidence does not support one. Use \u201cnot measured\u201d when the organization does not have the requested measurement; \u201cpending\u201d when the source is expected but not yet confirmed; and \u201cnot applicable\u201d only when the supplier can explain why the question does not apply to the stated entity, site, product or activity. Those states are different from \u201cno,\u201d and they should not be hidden inside a free-text comment.<\/p>\n<figure class=\"wp-block-image size-large koitor-blog-image\"><img decoding=\"async\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-process-supplier-evidence-scope.webp\" alt=\"Generic supplier evidence folders and metal samples grouped by review scope\" style=\"width:100%;max-width:960px;height:auto;display:block;margin:0 auto;\"  srcset=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-process-supplier-evidence-scope-18x10.webp 18w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-process-supplier-evidence-scope-150x150.webp 150w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-process-supplier-evidence-scope-300x169.webp 300w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-process-supplier-evidence-scope-768x432.webp 768w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-process-supplier-evidence-scope-1024x576.webp 1024w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-process-supplier-evidence-scope.webp 1200w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" loading=\"lazy\"\/><\/figure>\n<h2>Match the evidence to the claim, not to the document label<\/h2>\n<p>A document title can sound convincing while still answering a different question. Buyers should compare the claim, scope, date and source inside the document with the wording of the questionnaire. If the question asks about a production site, a group policy may need a site-specific explanation. If it asks about a product, a factory-wide policy is not product evidence. If it asks about a reporting year, a document with no period may be insufficient until the supplier clarifies its coverage.<\/p>\n<p>Think in terms of a claim chain:<\/p>\n<ol>\n<li><strong>Claim:<\/strong> What exact statement will the supplier make?<\/li>\n<li><strong>Boundary:<\/strong> Which legal entity, site, product, process or supplier tier does it cover?<\/li>\n<li><strong>Period:<\/strong> When was the data or record valid?<\/li>\n<li><strong>Evidence:<\/strong> Which existing record supports it?<\/li>\n<li><strong>Owner:<\/strong> Who can confirm the source and answer follow-up questions?<\/li>\n<li><strong>Limit:<\/strong> What is outside the evidence boundary?<\/li>\n<\/ol>\n<p>A hardware importer can apply that chain to several kinds of requests without assuming that every questionnaire needs the same fields. If the question asks for the name of a production site, an address or current site record may be appropriate. If the request asks how a process is controlled, the buyer may need a procedure or relevant process record, not a product photograph. If the buyer asks about a product material, the answer should identify the relevant component, supplier declaration or specification and revision. If packaging claims are involved, the buyer should define whether the request concerns the primary pack, inner protection, carton or transport packaging.<\/p>\n<p>The evidence must also be genuine and appropriately controlled. EcoVadis says it will not credit documents created solely to satisfy its questionnaire or copied from another organization without reasonable evidence of implementation. This is specific to EcoVadis\u2019 assessment rules, but it illustrates why buyers should not encourage suppliers to produce polished paperwork that does not reflect actual practice. A dated, imperfect record with a clear boundary can be more honest and useful than a newly written statement that overstates the evidence.<\/p>\n<p>Do not ask for more sensitive material than the decision requires. A supplier may have legitimate reasons to limit distribution of employee information, customer records, process details or confidential commercial documents. The buyer can ask for a summary, redacted copy, controlled review or confirmation from an accountable owner, provided the chosen method meets the buyer\u2019s own review requirements. Confidentiality is not a reason to accept an unsupported claim; it is a reason to agree on a suitable evidence path.<\/p>\n<h2>Design a hardware-supplier request that can be answered<\/h2>\n<p>A questionnaire should be designed around decisions the buyer needs to make. Broad questions such as \u201cAre you sustainable?\u201d are difficult to answer consistently and rarely identify a useful piece of evidence. A better request names the subject, scope and response format. For example: \u201cFor the site performing final assembly of the quoted metal storage rack, identify the relevant process owner, the current procedure or record that supports your answer, its issue or reporting date, and any operation performed by an outside supplier.\u201d<\/p>\n<p>The wording should not assume that the supplier owns every upstream process. A metal hardware product can include purchased magnets, screws, pads, packaging or finishing services. If the buyer asks about one of those inputs, identify the component or service and ask who controls the information. The supplier may need to request evidence from a sub-supplier. That answer should remain marked pending until it is received and checked; it should not be silently converted into a supplier-wide fact.<\/p>\n<p>A useful questionnaire contains three layers. The first records identity and scope: company, site, product or process, and date range. The second requests the answer and its supporting evidence. The third captures exceptions and follow-up actions: evidence owner, expected response date, limitation, and buyer decision. These layers make the form easier to route inside both organizations.<\/p>\n<p>Avoid mixing different questions into one field. \u201cList all certifications, materials, energy data, social policies and environmental actions\u201d is hard to review because each item may have a different owner, unit, site and validity period. If the buyer needs several types of information, use separate questions and specify whether an answer is optional, required for qualification, or needed only before a particular order milestone. The request should also distinguish a supplier\u2019s own process from a product-level claim or a third-party assessment result.<\/p>\n<p>For a supplier development project, it can be reasonable to phase the request. First confirm the applicable entity, site and process. Then request existing documents. After review, ask targeted follow-up questions only where the evidence is incomplete or ambiguous. This reduces duplicate requests and protects both sides from sending large amounts of irrelevant information.<\/p>\n<h2>Review gaps without inventing a score<\/h2>\n<p>A questionnaire response is an input to a buyer\u2019s decision, not a substitute for the buyer\u2019s own criteria. The buyer should decide in advance which questions are mandatory, which are informative, and which require escalation. A missing document may be a qualification gap, a timing issue or simply evidence that the requested measurement is not part of the supplier\u2019s current records. The buyer should not infer the cause without asking.<\/p>\n<p>Use a simple status system and apply it consistently. \u201cSupported\u201d means the relevant evidence was reviewed and appears to address the stated question and scope. \u201cNeeds clarification\u201d means the answer or boundary is ambiguous. \u201cPending\u201d means the supplier has identified a source or owner but has not provided the support. \u201cNot measured\u201d means no requested measurement is available for the stated period. \u201cNot applicable\u201d requires a reason tied to the stated scope. If the buyer\u2019s procurement policy requires an independent audit, questionnaire answers alone do not replace that audit.<\/p>\n<p>A status matrix can also identify the next action:<\/p>\n<div class=\"wp-block-table koitor-responsive-table\" style=\"max-width:100%;overflow-x:auto;\">\n<table style=\"width:100%;border-collapse:collapse;overflow-wrap:anywhere;\">\n<thead>\n<tr>\n<th>Status<\/th>\n<th>Buyer action<\/th>\n<th>Example next step<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Supported<\/td>\n<td>Record the boundary and date<\/td>\n<td>Keep the evidence reference with the supplier file<\/td>\n<\/tr>\n<tr>\n<td>Needs clarification<\/td>\n<td>Ask one targeted question<\/td>\n<td>Confirm whether the answer covers the quoted site<\/td>\n<\/tr>\n<tr>\n<td>Pending<\/td>\n<td>Assign an owner and due date<\/td>\n<td>Follow up before supplier approval or order release<\/td>\n<\/tr>\n<tr>\n<td>Not measured<\/td>\n<td>Decide whether the gap matters<\/td>\n<td>Request a baseline only if it is relevant and proportionate<\/td>\n<\/tr>\n<tr>\n<td>Not applicable<\/td>\n<td>Check the explanation<\/td>\n<td>Confirm that the scope does not include the activity<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Do not assign a sustainability rating merely by counting \u201cyes\u201d answers unless the buyer has a defined scoring method and can explain what the score means. A questionnaire with ten unsupported yes answers is not stronger evidence than one with fewer answers and clear limits. Likewise, the presence of a membership badge should not be described as an audit result unless the relevant program says that it represents one. Sedex describes supplier membership and self-assessment processes separately from audit activity; buyers should be precise about what a platform status establishes.<\/p>\n<p>For private-label hardware, the evidence map can be kept alongside the product specification, bill of materials and supplier approval record. If the material, finish, site or subcontractor changes, the buyer can then see which answers might need review. This is change control: it keeps the questionnaire connected to the product and process being purchased instead of treating it as a static form completed once.<\/p>\n<figure class=\"wp-block-image size-large koitor-blog-image\"><img decoding=\"async\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-checklist-questionnaire-evidence-owner.webp\" alt=\"Buyer checklist materials for tracking questionnaire scope, evidence owner and review date\" style=\"width:100%;max-width:960px;height:auto;display:block;margin:0 auto;\"  srcset=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-checklist-questionnaire-evidence-owner-18x10.webp 18w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-checklist-questionnaire-evidence-owner-150x150.webp 150w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-checklist-questionnaire-evidence-owner-300x169.webp 300w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-checklist-questionnaire-evidence-owner-768x432.webp 768w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-checklist-questionnaire-evidence-owner-1024x576.webp 1024w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/k1370-checklist-questionnaire-evidence-owner.webp 1200w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" loading=\"lazy\"\/><\/figure>\n<h2>A buyer checklist before closing the review<\/h2>\n<p>Before accepting a completed questionnaire, check that each material answer has enough context for another buyer or quality colleague to understand it later. Ask:<\/p>\n<ul>\n<li>Is the assessed legal entity named clearly?<\/li>\n<li>Is the site or operational location identified where the question requires it?<\/li>\n<li>Does the answer apply to the product, process or supplier tier being purchased?<\/li>\n<li>Is the reporting period or document date visible?<\/li>\n<li>Is the source a real record, a policy, a third-party document or an unsupported statement?<\/li>\n<li>Does the document show the boundary the answer claims?<\/li>\n<li>Is a sub-supplier involved, and is that scope visible?<\/li>\n<li>Are unknown, pending and not-applicable responses separated?<\/li>\n<li>Does the buyer know who owns each open item?<\/li>\n<li>Is the document share method appropriate for confidential information?<\/li>\n<li>Has the buyer recorded what the evidence does not establish?<\/li>\n<li>Is any mandatory audit or external review still outstanding?<\/li>\n<\/ul>\n<p>Store the completed map with the supplier qualification record and identify the version of the questionnaire used. If the supplier later sends a replacement file, keep a clear link between the prior answer, the new evidence and the decision that changed. This matters when procurement, sustainability and quality teams review the same supplier at different times.<\/p>\n<p>When asking a supplier to complete the form, include a short instruction: \u201cPlease answer for the named company, site, product or process in each question. Where the information is unavailable, mark it as pending, not measured or not applicable and explain the scope. Attach only existing evidence that supports the answer and identify the document date, site and owner.\u201d This is more constructive than pressuring the supplier to provide a positive response to every item.<\/p>\n<p>For projects involving metal forming, welding, finishing, assembly or packaging, buyers can ask questions that map to the actual process path. Koitor Hardware is a family-owned custom metal hardware factory focused on bathroom and home storage hardware and supports OEM customization. That context can make product drawings, sample revisions, finish choices and packaging questions relevant to a buyer\u2019s supplier review, but it does not establish a specific sustainability score, certificate or measurement. Buyers should request and review the applicable information directly rather than infer it from a supplier profile.<\/p>\n<p>If a supplier questionnaire is part of an OEM project, buyers can explain the product scope when they <a href=\"https:\/\/koitorhardware.com\/de\/oem-home-storage-hardware-manufacturer\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">review Koitor\u2019s home-storage hardware OEM scope<\/a>. For a question that needs a specific owner or evidence source, <a href=\"https:\/\/koitorhardware.com\/de\/kontakt\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">send the sourcing request to Koitor<\/a> with the relevant product, site and document context.<\/p>\n<h2>H\u00e4ufig gestellte Fragen<\/h2>\n<h3>Does a completed sustainability questionnaire prove that a supplier is certified?<\/h3>\n<p>No. A questionnaire records responses to the questions asked. A third-party assessment, certificate, audit or product declaration has its own scope, process and validity conditions. Buyers should name the exact document or assessment they require and verify that it applies to the legal entity, site or product under review.<\/p>\n<h3>Can a buyer accept a supplier policy as evidence?<\/h3>\n<p>Sometimes, if the question asks whether a policy exists. A policy may not prove that an action was implemented at a particular site or that a metric was achieved. Match the evidence type to the claim, then record what the document does and does not establish.<\/p>\n<h3>What should a supplier do when it does not have a requested data point?<\/h3>\n<p>It should state that the data is not measured or is not available for the requested scope and period, identify an owner if follow-up is possible, and avoid substituting an estimate without clearly labeling it. The buyer can then decide whether the gap is material to supplier qualification.<\/p>\n<h3>Should a buyer request the same documents from every supplier?<\/h3>\n<p>Not necessarily. A consistent core questionnaire can support comparison, but the evidence required may depend on the product, site, process, market and purchasing decision. Keep common questions stable and add only scoped follow-ups that are relevant to the supplier or product being evaluated.<\/p>\n<h3>How often should questionnaire evidence be refreshed?<\/h3>\n<p>Use the buyer\u2019s qualification policy and the document\u2019s own validity or reporting period. Revisit evidence when the entity, site, product, material, finish, subcontractor or process changes, or when the buyer\u2019s requirements change. Do not treat an old document as current merely because it remains in a shared folder.<\/p>\n<h2>Arbeiten Sie mit Koitor Hardware zusammen<\/h2>\n<p>The evidence you request should match the hardware, process and supplier scope you are reviewing. Share the product family, site or process in scope, the questionnaire fields and the evidence format you need. Koitor can discuss the relevant OEM project information and clarify which questions require confirmation by the responsible owner.<\/p>\n<section class=\"koitor-blog-cta\" style=\"margin:40px 0 0;padding:28px;border:1px solid #F1D3C5;border-radius:14px;background:#FFF9F6;\">\n<h3 style=\"margin:0 0 12px;color:#1F2937;font-size:24px;line-height:1.3;\">Discuss a Relevant Metal Hardware Project<\/h3>\n<p style=\"font-size:16px;line-height:1.7;margin-bottom:20px;color:#344054;\">Share the product scope, drawings or samples, quantities and requirements relevant to this decision. Koitor can clarify whether a metal hardware project fits its confirmed production scope. The supplier sustainability questionnaire evidence specification should state the intended interface and review conditions.<\/p>\n<div style=\"display:flex;gap:12px;flex-wrap:wrap;align-items:center;margin-bottom:24px;\">\n    <a href=\"https:\/\/koitorhardware.com\/de\/kontakt\/\" style=\"display:inline-flex;align-items:center;justify-content:center;min-height:48px;padding:0 22px;border-radius:8px;background:#FF5A1F;color:#ffffff;font-weight:700;text-decoration:none;line-height:1;\">Besprechen Sie Ihre Anforderungen<\/a><br \/>\n    <a href=\"https:\/\/koitorhardware.com\/de\/oem-home-storage-hardware-manufacturer\/\" style=\"display:inline-flex;align-items:center;justify-content:center;min-height:48px;padding:0 22px;border-radius:8px;border:1px solid #FF5A1F;color:#FF5A1F;background:#ffffff;font-weight:700;text-decoration:none;line-height:1;\">Review Koitor OEM Scope<\/a>\n  <\/div>\n<div class=\"koitor-article-tags\" style=\"margin-top:24px;padding-top:18px;border-top:1px solid #E5E7EB;display:flex;align-items:center;gap:8px;flex-wrap:wrap;\">\n    <span style=\"font-size:14px;font-weight:700;color:#344054;margin-right:4px;\">Stichw\u00f6rter:<\/span><br \/>\n    <span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">Leitfaden f\u00fcr Importeure<\/span><br \/>\n    <span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">Badezimmer-Accessoires unter Eigenmarke<\/span><br \/>\n    <span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">Qualit\u00e4tskontrolle<\/span>\n  <\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>Map supplier sustainability questionnaire evidence by entity, site, product, reporting period and owner before relying on a hardware supplier&#8217;s answers.<\/p>","protected":false},"author":1,"featured_media":6834,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[40,44,37],"class_list":["post-6837","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-product-knowledge","tag-importer-buying-guide","tag-private-label-bathroom-accessories","tag-quality-control"],"_links":{"self":[{"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/posts\/6837","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/comments?post=6837"}],"version-history":[{"count":1,"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/posts\/6837\/revisions"}],"predecessor-version":[{"id":6838,"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/posts\/6837\/revisions\/6838"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/media\/6834"}],"wp:attachment":[{"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/media?parent=6837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/categories?post=6837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/koitorhardware.com\/de\/wp-json\/wp\/v2\/tags?post=6837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}