{"id":841,"date":"2026-09-08T06:02:15","date_gmt":"2026-09-08T06:02:15","guid":{"rendered":"https:\/\/koitorhardware.com\/?p=841"},"modified":"2026-09-08T06:02:16","modified_gmt":"2026-09-08T06:02:16","slug":"plazo-de-produccion-de-los-accesorios-de-bano","status":"publish","type":"post","link":"https:\/\/koitorhardware.com\/es\/bathroom-hardware-production-lead-time\/","title":{"rendered":"Plazos de entrega en la fabricaci\u00f3n de accesorios de ba\u00f1o: gu\u00eda para compradores"},"content":{"rendered":"<p>Bathroom hardware production lead time depends on when the product specification becomes clear, whether materials and finishing inputs are available, how many sample revisions are required, and when packaging is approved. At Koitor, samples usually take about 5\u20137 working days after design and materials are confirmed, while bulk production usually takes about 4\u20136 weeks depending on quantity, complexity, material availability, finish and packaging. These are planning ranges rather than guaranteed deadlines. Buyers should build the schedule around approval milestones, not only the date a quotation is requested.<\/p>\n<h2>What is a typical lead time for bathroom hardware?<\/h2>\n<figure id=\"attachment_847\" aria-describedby=\"caption-attachment-847\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-847\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-process-production-milestones-1024x512.webp\" alt=\"Custom towel rack sample and bulk production milestone review\" width=\"1024\" height=\"512\" srcset=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-process-production-milestones-1024x512.webp 1024w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-process-production-milestones-300x150.webp 300w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-process-production-milestones-768x384.webp 768w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-process-production-milestones-1536x768.webp 1536w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-process-production-milestones-18x9.webp 18w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-process-production-milestones.webp 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption id=\"caption-attachment-847\" class=\"wp-caption-text\">Custom towel rack sample and bulk production milestone review<\/figcaption><\/figure>\n<p>A typical schedule includes a pre-sample clarification period, sample production and approval, then material preparation, fabrication, finishing, assembly, inspection and packaging for the bulk order. The calendar begins at different points depending on what the buyer and factory have already confirmed.<\/p>\n<p>For a straightforward towel rack, shower caddy, wire basket or tissue holder, Koitor usually needs around 5\u20137 working days to prepare a sample after the design and materials are confirmed. A sample can take longer when the drawing remains open, a special component is unavailable, tooling is needed, a custom finish must be prepared or the buyer requests several versions.<\/p>\n<p>Bulk production usually takes around 4\u20136 weeks after the relevant order details and approvals are complete. The actual duration depends on order quantity, product structure, raw-material availability, welding and finishing work, assembly, packaging and the production schedule at that time.<\/p>\n<p>Shipping time is separate from manufacturing lead time. Buyers should distinguish factory completion, inspection, cargo readiness, handover to the forwarder and arrival at the destination. Customs, booking and international transport are not part of the factory production range unless specifically included in the commercial arrangement.<\/p>\n<p>Do not count backward from a retail launch using only the nominal 4\u20136 week range. Add time for quotation clarification, sample shipment, internal review, revisions, artwork approval, pre-shipment inspection and transport. A realistic plan also allows decision time on the buyer&#8217;s side.<\/p>\n<p>When comparing the OEM lead time bathroom accessories suppliers provide, ask what event starts the clock. One supplier may count from deposit, another from sample approval, and another from material confirmation. Write the agreed start point and dependencies into the order schedule.<\/p>\n<h2>What must be confirmed before sample production begins?<\/h2>\n<p>Sample production should begin after the buyer and factory have confirmed enough information to build a meaningful reference. Starting too early can create a fast sample that answers the wrong question.<\/p>\n<p>Confirm the product type, application and intended installation. A wall-mounted towel shelf, freestanding rack, shower basket and tissue holder need different structural and mounting information. State whether the sample is for appearance, installation, packaging, retailer presentation or a broader functional review.<\/p>\n<p>Approve or clearly mark the current drawing. Critical dimensions can include overall size, wire spacing, tube diameter, wall-bracket distance, mounting holes, shelf clearance and accessory positions. If a physical sample is used, identify what should be copied and what should be changed.<\/p>\n<p>Confirm the material by component. The main rack, wire, tube, bracket, decorative cover and fasteners may not use the same material. If the factory is expected to propose an alternative, ask it to describe the effect on structure, appearance, cost and schedule.<\/p>\n<p>Define the surface finish. For powder coating, provide a color, gloss or texture reference where possible. For brushed or polished stainless steel, define the intended appearance and direction. A custom color sample may require preparation before the complete product sample can be finished.<\/p>\n<p>List every included component. Mounting hardware, hooks, feet, trays, screws, anchors, instruction sheets and packaging inserts can affect fit and review. If temporary sample accessories will be replaced later, record that limitation.<\/p>\n<p>Finally, confirm who can approve the sample and how comments will be returned. One consolidated revision list is faster and clearer than separate messages from purchasing, design, packaging and sales teams.<\/p>\n<p>De Koitor\u2019s <a style=\"color: #0b5cad; font-weight: 600; text-decoration: underline; text-underline-offset: 3px;\" href=\"https:\/\/koitorhardware.com\/es\/fabricante-de-accesorios-de-bano-a-medida\/\">Fabricaci\u00f3n de accesorios de ba\u00f1o para fabricantes de equipos originales (OEM)<\/a> page provides a useful starting point for buyers preparing drawings, physical samples and customization requirements.<\/p>\n<h2>Why can bathroom hardware sample lead time become longer?<\/h2>\n<p>Sample lead time becomes longer when the factory must resolve missing information, source an uncommon input, create tooling, prepare a special finish or repeat work after a design change. The cause is often approval uncertainty rather than fabrication time alone.<\/p>\n<p>An incomplete drawing can delay the sample before metal is cut. If mounting-hole spacing, wire diameter or bracket construction remains open, the production team may need to prepare options or wait for buyer direction. A quick assumption can create more delay later if the sample must be rebuilt.<\/p>\n<p>Physical samples also need interpretation. The reference may be worn, bent or assembled with parts the buyer does not want. Measurement and drawing preparation add useful time because they create a controlled basis for the new product.<\/p>\n<p>Material availability matters when a project uses an uncommon tube section, wire size, sheet thickness or fastener. A buyer can ask whether a standard available size could be evaluated, but any substitution should be approved and documented before sampling.<\/p>\n<p>Surface finishing can introduce its own queue and preparation steps. A standard black powder coating may follow a different schedule from a custom color or texture. Plated, brushed or polished finishes require the relevant sample preparation and should be reviewed on the actual fabricated product.<\/p>\n<p>Tooling or fixtures may be needed for bends, punched parts, repeatable bracket spacing or assembly. Buyers should ask whether the first sample uses temporary methods and whether production tooling could change the final appearance or dimensions.<\/p>\n<p>Sample shipping and buyer review are part of the project calendar even though they are not factory processing time. International delivery, internal meetings and retailer feedback can take longer than making the sample. Track these stages separately.<\/p>\n<p>Design changes restart affected work. Moving a bracket may alter welding, polishing, packaging and installation instructions. Before requesting a revision, identify which approved items remain valid and which need to be reviewed again.<\/p>\n<h2>What stages make up a bathroom hardware bulk production schedule?<\/h2>\n<p>A bulk production schedule normally moves through order confirmation, material preparation, component fabrication, welding, surface finishing, assembly, inspection, packaging and shipment readiness. Some stages can overlap, while others depend on the previous stage being complete.<\/p>\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Production stage<\/th>\n<th scope=\"col\">Main work<\/th>\n<th scope=\"col\">What must be ready<\/th>\n<th scope=\"col\">Common schedule risk<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Order release<\/td>\n<td>Confirm purchase order and production documents<\/td>\n<td>Drawing, material, finish, quantity and terms<\/td>\n<td>Conflicting revisions or open approvals<\/td>\n<\/tr>\n<tr>\n<td>Material preparation<\/td>\n<td>Plan and obtain wire, tube, sheet and components<\/td>\n<td>Confirmed bill of materials<\/td>\n<td>Uncommon sizes or late substitutions<\/td>\n<\/tr>\n<tr>\n<td>Fabricaci\u00f3n<\/td>\n<td>Cutting, bending, punching and forming<\/td>\n<td>Controlled dimensions and tooling<\/td>\n<td>Tooling changes or dimensional rework<\/td>\n<\/tr>\n<tr>\n<td>Welding and finishing preparation<\/td>\n<td>Join components, grind and polish as required<\/td>\n<td>Approved structure and fixture plan<\/td>\n<td>Distortion or appearance correction<\/td>\n<\/tr>\n<tr>\n<td>Acabado superficial<\/td>\n<td>Powder coating, polishing or other agreed finish<\/td>\n<td>Approved color and surface reference<\/td>\n<td>Custom finish preparation or rejected appearance<\/td>\n<\/tr>\n<tr>\n<td>Assembly and inspection<\/td>\n<td>Fit parts and check approved requirements<\/td>\n<td>Complete accessory set and criteria<\/td>\n<td>Missing components or unclear acceptance points<\/td>\n<\/tr>\n<tr>\n<td>Embalaje<\/td>\n<td>Protect products, add labels and carton goods<\/td>\n<td>Approved packaging and artwork<\/td>\n<td>Late artwork or unavailable printed materials<\/td>\n<\/tr>\n<tr>\n<td>Cargo readiness<\/td>\n<td>Complete final records and handover preparation<\/td>\n<td>Inspection decision and shipping instructions<\/td>\n<td>Late booking or document changes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The table is a sequence guide, not a promise that every project takes the same number of days. A simple repeat order using available materials and approved packaging differs from a new multi-tier rack with custom color, tooling and retail artwork.<\/p>\n<p>A reliable bathroom hardware production lead time is therefore a milestone-based estimate linked to confirmed inputs. It should be updated when a material, structure, finish or packaging decision changes the planned work.<\/p>\n<p>Ask the factory for milestone dates rather than one final completion date. Useful milestones include production-document approval, material readiness, fabrication completion, finish completion, final inspection and cargo readiness. These points make delays easier to identify and manage.<\/p>\n<p>Bulk production should follow the approved sample and current documents. If the production method changes from the sample method, confirm any effect on dimensions, appearance or assembly. Temporary sample tools should not become an unrecorded production assumption.<\/p>\n<h2>Which factors most often delay production and packaging?<\/h2>\n<p>The most common delays come from changing specifications, material or finish availability, late packaging artwork, incomplete accessory decisions and slow approval communication. Many can be reduced by identifying dependencies before the order is released.<\/p>\n<p>Late drawing changes have a wide effect. A change to rack depth can alter wire length, bending, welding fixtures, package dimensions and carton quantity. Ask for a schedule impact before approving a change after materials or tooling have been prepared.<\/p>\n<p>Custom finishes may require color matching, sample review and batch planning. Buyers should approve the finish reference early and understand whether it is shared across several products. A late color decision can hold otherwise completed metal parts.<\/p>\n<p>Printed packaging often runs on a separate schedule. Dielines, artwork, barcodes, language versions and retailer approval should begin early enough to support production. A completed rack cannot be packed into a box that has not been approved or produced.<\/p>\n<p>Accessories can be small but schedule-critical. Screws, anchors, set screws, decorative covers, feet and instruction sheets must match the product. A missing accessory can prevent final packing even when fabrication is complete.<\/p>\n<p>Quality questions should have defined acceptance criteria. Vague comments such as \u201cfinish not good\u201d require investigation before corrective work can begin. Use photographs, approved samples and specific affected areas to speed communication.<\/p>\n<p>Buyer-side approvals should have named owners and response dates. If engineering, retail, packaging and purchasing teams review separately, appoint one person to consolidate the final decision. Conflicting approvals create rework and uncertainty.<\/p>\n<p>Seasonal capacity and holidays can affect material suppliers, finishing partners, factories and freight. Ask about these constraints when planning launch dates, and leave reasonable time for inspection and shipping rather than scheduling cargo readiness at the last possible day.<\/p>\n<h2>How can buyers reduce bathroom hardware production lead time?<\/h2>\n<p>Buyers can reduce lead time by providing complete information, approving decisions quickly, using available materials where suitable and developing packaging in parallel with the metal product. The goal is to remove waiting and rework without skipping necessary checks.<\/p>\n<p>Send one revision-controlled RFQ with the product drawing or sample, critical dimensions, material, finish, quantity, accessories and packaging expectations. Mark open decisions and request factory proposals before the sample start date.<\/p>\n<p>Prioritize the decisions that block other work. Product dimensions and structure usually affect material preparation, fixtures and packaging. Artwork cannot be finalized reliably if the package or product size remains open.<\/p>\n<p>Ask which materials, component sizes and finishes are routinely available. If an alternative could shorten the schedule, review it as a separate documented option. Do not accept an unapproved substitution simply to protect a date.<\/p>\n<p>Develop the packing plan during sampling. Check how brackets, hooks and mounting hardware are protected. Prepare dielines and artwork early, while keeping final print release dependent on the approved product and package structure.<\/p>\n<p>Use one comment sheet with drawing references and photographs. Classify each item as required correction, optional improvement or question. Confirm whether a revision changes the target schedule before requesting it.<\/p>\n<p>Reserve time for sample shipment and approval. If photographs or video can answer a limited question, agree how they will be used, but do not replace a required physical review with images merely to save time.<\/p>\n<h3>Lead-time planning checklist for buyers<\/h3>\n<ul>\n<li><strong>Product brief:<\/strong> application, installation, intended contents and target market.<\/li>\n<li><strong>Controlled reference:<\/strong> current drawing, physical sample or marked photographs.<\/li>\n<li><strong>Critical dimensions:<\/strong> mounting, fit, usable space and component sizes.<\/li>\n<li><strong>Material:<\/strong> grade or material family by component and acceptable alternatives.<\/li>\n<li><strong>Final:<\/strong> approved color, gloss, texture, polishing or brushing reference.<\/li>\n<li><strong>Accesorios:<\/strong> complete hardware, instructions and component quantities.<\/li>\n<li><strong>Sample plan:<\/strong> purpose, quantity, temporary details and approval owner.<\/li>\n<li><strong>Embalaje:<\/strong> protection, sales unit, artwork status and carton requirements.<\/li>\n<li><strong>Order quantity:<\/strong> trial quantity, MOQ, variants and repeat forecast.<\/li>\n<li><strong>Milestones:<\/strong> sample approval, material readiness, finish, inspection and cargo readiness.<\/li>\n<li><strong>Buyer response dates:<\/strong> named decision owners and consolidated feedback.<\/li>\n<li><strong>Shipping plan:<\/strong> inspection, booking, handover and transit time kept separate from production.<\/li>\n<\/ul>\n<p>For related preparation steps, buyers can use Koitor&#8217;s <a style=\"color: #0b5cad; font-weight: 600; text-decoration: underline; text-underline-offset: 3px;\" href=\"https:\/\/koitorhardware.com\/es\/recursos\/\">Recursos para la adquisici\u00f3n de accesorios de ba\u00f1o<\/a> to review RFQs, samples, materials, finish, packaging and inspection.<\/p>\n<h2>Frequently asked questions about bathroom hardware lead time<\/h2>\n<figure id=\"attachment_848\" aria-describedby=\"caption-attachment-848\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-848\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-checklist-bathroom-hardware-lead-time-1024x512.webp\" alt=\"Bathroom hardware production lead-time checklist for importers\" width=\"1024\" height=\"512\" srcset=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-checklist-bathroom-hardware-lead-time-1024x512.webp 1024w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-checklist-bathroom-hardware-lead-time-300x150.webp 300w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-checklist-bathroom-hardware-lead-time-768x384.webp 768w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-checklist-bathroom-hardware-lead-time-1536x768.webp 1536w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-checklist-bathroom-hardware-lead-time-18x9.webp 18w, https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/09\/k035-checklist-bathroom-hardware-lead-time.webp 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption id=\"caption-attachment-848\" class=\"wp-caption-text\">Bathroom hardware production lead-time checklist for importers<\/figcaption><\/figure>\n<p>These answers explain common timing questions for custom towel racks, shower caddies, wire baskets and tissue holders. Every date should still be confirmed for the specific project.<\/p>\n<h3>How long does a bathroom hardware sample usually take?<\/h3>\n<p>At Koitor, a sample usually takes about 5\u20137 working days after design and materials are confirmed. Tooling, uncommon inputs, custom finishes, complex structures or multiple revisions can extend the schedule.<\/p>\n<h3>How long does bulk production usually take?<\/h3>\n<p>Bulk production usually takes around 4\u20136 weeks depending on quantity, complexity, material availability, finish and packaging. Confirm the start milestone and actual capacity when placing the order.<\/p>\n<h3>Does the quoted lead time include shipping?<\/h3>\n<p>Not unless the quotation states that it does. Separate factory production, inspection, cargo readiness, forwarder handover and international transit so each responsibility and date is clear.<\/p>\n<h3>Can a custom color delay production?<\/h3>\n<p>Yes. Custom colors may require preparation, a finish sample, buyer approval and batch planning. Approve the reference early and ask whether color development affects the production start.<\/p>\n<h3>Can production start before the sample is approved?<\/h3>\n<p>Starting affected bulk work before approval increases the risk of rework or unusable material. Buyers and suppliers should agree which limited preparations are safe and which stages must wait for sample approval.<\/p>\n<h3>How should a buyer monitor an order without slowing the factory?<\/h3>\n<p>Agree a small set of meaningful milestones and reporting dates. Request consolidated updates tied to material readiness, fabrication, finish, inspection and cargo readiness instead of asking for unscheduled daily reports.<\/p>\n<h2>Plan your bathroom hardware schedule with Koitor<\/h2>\n<p>Koitor Hardware is a family-owned custom metal hardware factory supporting small-batch OEM production for bathroom and home storage hardware. Buyers can send drawings or physical samples to discuss product structure, materials, finish, sample timing, production planning and packaging before quotation.<\/p>\n<section class=\"koitor-blog-cta\" style=\"margin-top: 36px; padding: 28px; border: 1px solid #D0D5DD; border-radius: 16px; background: #F8FAFC;\">\n<h3 style=\"margin-top: 0; margin-bottom: 12px; font-size: 28px; line-height: 1.25; color: #101828;\">Need a Realistic Sample and Production Schedule?<\/h3>\n<p style=\"font-size: 16px; line-height: 1.7; margin-bottom: 20px; color: #344054;\">Send Koitor your drawing or sample, material, finish, packaging idea, target quantity and required delivery window. Our team can identify approval dependencies and prepare a project-specific timing estimate before quotation.<\/p>\n<div style=\"display: flex; gap: 12px; flex-wrap: wrap; align-items: center; margin-bottom: 24px;\"><a style=\"display: inline-flex; align-items: center; justify-content: center; min-height: 48px; padding: 0 22px; border-radius: 8px; background: #FF5A1F; color: #ffffff; font-weight: bold; text-decoration: none; line-height: 1;\" href=\"https:\/\/koitorhardware.com\/es\/contacto\/\">Discuss Lead Time<\/a><br \/>\n<a style=\"display: inline-flex; align-items: center; justify-content: center; min-height: 48px; padding: 0 22px; border-radius: 8px; border: 1px solid #FF5A1F; color: #ff5a1f; background: #ffffff; font-weight: bold; text-decoration: none; line-height: 1;\" href=\"https:\/\/koitorhardware.com\/es\/accesorios-de-bano-de-marca-propia\/\">Review Private-Label Development<\/a><\/div>\n<div class=\"koitor-article-tags\" style=\"margin-top: 24px; padding-top: 18px; border-top: 1px solid #E5E7EB; display: flex; align-items: center; gap: 8px; flex-wrap: wrap;\"><span style=\"font-size: 14px; font-weight: bold; color: #344054; margin-right: 4px;\">Etiquetas:<\/span><br \/>\n<span style=\"display: inline-flex; align-items: center; justify-content: center; padding: 6px 12px; border-radius: 999px; background: #FFF3ED; color: #ff5a1f; font-size: 13px; font-weight: 600; line-height: 1.2;\">Accesorios de ba\u00f1o OEM<\/span><br \/>\n<span style=\"display: inline-flex; align-items: center; justify-content: center; padding: 6px 12px; border-radius: 999px; background: #FFF3ED; color: #ff5a1f; font-size: 13px; font-weight: 600; line-height: 1.2;\">Fabricaci\u00f3n por encargo (OEM) en lotes peque\u00f1os<\/span><br \/>\n<span style=\"display: inline-flex; align-items: center; justify-content: center; padding: 6px 12px; border-radius: 999px; background: #FFF3ED; color: #ff5a1f; font-size: 13px; font-weight: 600; line-height: 1.2;\">Cantidad m\u00ednima de pedido y muestras<\/span><br \/>\n<span style=\"display: inline-flex; align-items: center; justify-content: center; padding: 6px 12px; border-radius: 999px; background: #FFF3ED; color: #ff5a1f; font-size: 13px; font-weight: 600; line-height: 1.2;\">Gu\u00eda de compra para importadores<\/span><\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>Planificar los plazos de producci\u00f3n de los accesorios de ba\u00f1o, tanto para muestras como para pedidos al por mayor, revisando los planos, los materiales, los acabados, el embalaje y las fases de aprobaci\u00f3n.<\/p>","protected":false},"author":1,"featured_media":849,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[28],"tags":[],"class_list":["post-841","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oem-manufacturing-guide"],"_links":{"self":[{"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/posts\/841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/comments?post=841"}],"version-history":[{"count":2,"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/posts\/841\/revisions"}],"predecessor-version":[{"id":850,"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/posts\/841\/revisions\/850"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/media\/849"}],"wp:attachment":[{"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/media?parent=841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/categories?post=841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/koitorhardware.com\/es\/wp-json\/wp\/v2\/tags?post=841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}