{"id":10522,"date":"2026-11-25T10:03:26","date_gmt":"2026-11-25T10:03:26","guid":{"rendered":"https:\/\/koitorhardware.com\/how-to-install-a-recessed-toilet-paper-holder\/"},"modified":"2026-11-25T10:03:26","modified_gmt":"2026-11-25T10:03:26","slug":"how-to-install-a-recessed-toilet-paper-holder","status":"publish","type":"post","link":"https:\/\/koitorhardware.com\/fr\/how-to-install-a-recessed-toilet-paper-holder\/","title":{"rendered":"How to Install a Recessed Toilet Paper Holder: Name the System and Kit First"},"content":{"rendered":"<p>How to install a recessed toilet paper holder depends on which recessed system the product ships with. Some units clamp into a finished wall opening from the front, some fix to backing placed before the wall is closed, and some offer both. The install leaflet should name that architecture, list the fixing parts in the box, and send every opening or depth figure to the product drawing.<\/p>\n<p>This guide covers that leaflet decision. It is written for importers, distributors and private-label teams who sell manufactured recessed holders and must approve the install sheet and kit that go into the carton. It does not teach wall framing, and it does not cover building a custom wooden niche, which is a different project from installing a manufactured holder.<\/p>\n<p>Koitor Hardware is a family-owned China OEM manufacturer of custom metal bathroom and home storage hardware, including tissue holders. Recessed models are a recognised product type in our published buyer files. This page explains what must be settled before a carton or listing says the holder is easy to install in the wall.<\/p>\n<p>Two neighboring files already exist. The <a href=\"https:\/\/koitorhardware.com\/fr\/recessed-toilet-paper-holder-wall-cavity-specification\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">recessed toilet paper holder wall cavity specification<\/a> covers finished-face depth, rough opening, flange overlap and clamp-versus-backing approval at drawing stage. The <a href=\"https:\/\/koitorhardware.com\/fr\/toilet-paper-holder-installation\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">toilet paper holder installation<\/a> guide covers surface-mount kits and already routes recessed units away. This page sits between them: the shipped system and the packed kit.<\/p>\n<h2>What does how to install a recessed toilet paper holder depend on?<\/h2>\n<p>It depends on three named facts: the recessed architecture, the packed fixing kit and the wall condition the product was sampled in. Once those are written down, the steps follow. Without them, any step list is a guess, and a guess on a carton becomes a return when it does not match the wall.<\/p>\n<p>The architecture is the way the recessed body is held in the wall. A front-clamp or retrofit design fits into an opening cut in a finished wall and uses clamps, tabs or wings that tighten against the back of the wall board. A backed or new-work design fixes the body with screws into blocking, studs or a frame installed before the wall is closed. Some products support both.<\/p>\n<p>The packed kit is what the buyer receives: the body, any clamps or wings, screws, a template, any backplate or trim ring, and the leaflet. The leaflet can only describe parts that are in the box or clearly marked as sold separately.<\/p>\n<p>The wall condition is the board or panel type and finish used in sampling. A drywall mock-up does not prove a fit on tile over cement board, and a new-work frame does not prove a retrofit clamp. Name the wall types the sample was tested in, and send other walls to the project installer.<\/p>\n<h3>Why architecture comes before steps<\/h3>\n<p>A front-clamp unit and a backed unit share almost no steps after the opening is marked. One tightens clamps from the front; the other screws into backing. A leaflet that mixes them confuses installers and invites the wrong fixing. Name the architecture in the first line of the leaflet and keep the steps to that architecture.<\/p>\n<h3>Why this is not a niche-building guide<\/h3>\n<p>Search results mix manufactured holders with DIY wooden niches. Those projects build the recess from timber and finish it with paint or tile. They are useful home projects but they are not this product. The leaflet should not borrow their framing steps or their cut sizes.<\/p>\n<h2>Which recessed install architecture does the SKU actually ship?<\/h2>\n<p>Identify it from the drawing and the sample, then write it in plain words at the top of the leaflet. The three common answers are front-clamp retrofit, backed new-work, or a dual system with both options. If the product uses another named method, describe that method rather than forcing it into one of these labels.<\/p>\n<p>A front-clamp retrofit holder usually has a body with a front flange and two or more clamps or wings on the sides or corners. After the body is pushed into the opening, screws from the front pull the clamps against the back of the wall board. The flange hides the cut edge.<\/p>\n<p>A backed new-work holder usually has mounting holes or ears on the body that screw into blocking or a frame. The opening in the wall board is cut around the body after it is fixed, or the board is fitted around it. The flange still covers the edge.<\/p>\n<p>A dual system ships both the clamps and screw holes, or offers a separate backplate. The leaflet must then show two short paths and say when to use each, rather than one blended sequence.<\/p>\n<figure class=\"wp-block-image size-large koitor-blog-image\" style=\"margin:32px 0;\">\n  <img decoding=\"async\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/BX1125-02-process-delivery.webp\" alt=\"Brushed stainless recessed toilet paper holder test-fitted into a cut opening in a drywall mock-up panel with clamp tabs behind\" style=\"width:100%;max-width:960px;height:auto;display:block;margin:0 auto;border-radius:10px;\" \/><figcaption style=\"font-size:14px;color:#667085;text-align:center;margin-top:8px;\">A mock-up fit shows whether the shipped architecture and the packed clamps suit the wall the leaflet describes.<\/figcaption><\/figure>\n<h3>What the architecture changes in the leaflet<\/h3>\n<div class=\"koitor-table-scroll\" style=\"overflow-x:auto;\">\n<table>\n<thead>\n<tr>\n<th>Architecture<\/th>\n<th>Fixing parts the leaflet should list<\/th>\n<th>Key leaflet steps<\/th>\n<th>What the leaflet must not do<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Front-clamp retrofit<\/td>\n<td>Body, clamp set, clamp screws, template if packed<\/td>\n<td>Mark from template, cut opening per drawing, insert body, tighten clamps evenly, check flange<\/td>\n<td>Print a universal cut size or a no-backing promise for every wall<\/td>\n<\/tr>\n<tr>\n<td>Backed new-work<\/td>\n<td>Body, mounting screws, template if packed<\/td>\n<td>Confirm blocking or frame position, fix body, fit wall board, finish around flange<\/td>\n<td>Assume backing exists in a finished wall<\/td>\n<\/tr>\n<tr>\n<td>Dual system<\/td>\n<td>Both fixing sets, any backplate<\/td>\n<td>Choose path first, then follow that path only<\/td>\n<td>Blend clamp and backing steps into one list<\/td>\n<\/tr>\n<tr>\n<td>Other named system<\/td>\n<td>Parts named by the supplier<\/td>\n<td>Follow the supplier&#8217;s documented sequence<\/td>\n<td>Relabel it as clamp or backed to fit a template<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Opening sizes, depths and flange overlaps stay on the product drawing and the <a href=\"https:\/\/koitorhardware.com\/fr\/recessed-toilet-paper-holder-wall-cavity-specification\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">cavity specification<\/a> file. The leaflet points to them by model.<\/p>\n<h3>Clamp range and wall thickness<\/h3>\n<p>A clamp only works across a range of wall thickness. The drawing should state that range for the model. The leaflet can say &#8220;suitable for the wall thicknesses shown on the drawing&#8221; and print the drawing&#8217;s figure with the model reference. It should not print a range copied from another product.<\/p>\n<h3>Backing material<\/h3>\n<p>Backed units depend on what the screws bite into. The leaflet can name the screw type supplied and say &#8220;fix into suitable backing as directed by your installer.&#8221; It should not specify timber sizes, spans or anchor ratings that the supplier has not documented.<\/p>\n<h3>Listing wording for each architecture<\/h3>\n<p>The product listing should carry the same architecture word as the leaflet. A retrofit clamp unit can say &#8220;for installation in an existing finished wall within the thickness range shown.&#8221; A backed unit can say &#8220;for new-work installation with backing fitted before the wall is closed.&#8221; A dual unit can say both, each with its condition. Generic lines such as &#8220;easy in-wall install&#8221; leave the buyer to guess.<\/p>\n<p>Retail category managers often ask for one sentence that works for every recessed SKU in a range. That rarely holds. Two holders that look identical from the front may use different clamps or no clamps at all. Write the listing line per architecture and copy it to every SKU that shares that architecture.<\/p>\n<h3>Finish build-up and the flange<\/h3>\n<p>Tile, render and paint all add thickness to the wall face. The flange must cover the cut edge after that build-up. The drawing should show the flange overlap for the model, and the leaflet can tell the installer to cut the opening before the final finish only where the drawing allows. Do not print a fixed overlap from another product.<\/p>\n<h3>Commercial and residential programs<\/h3>\n<p>Commercial washroom programs often specify recessed holders in new-build projects, where backing is planned on drawings and installed by trade contractors. Residential retail buyers more often fit holders into existing walls. The same body may be sold into both channels, but the leaflet emphasis differs. A commercial leaflet can lean on the backed path and the project specification; a retail leaflet should lead with the retrofit path if clamps are packed.<\/p>\n<h2>What must be packed or explicitly excluded?<\/h2>\n<p>Every part the leaflet mentions must be in the box or marked &#8220;not supplied.&#8221; Most install complaints about recessed holders come from a mismatch between the sheet and the bag: a template shown but not packed, clamps drawn but missing, or screws too short for the wall. A kit audit at sample approval prevents this.<\/p>\n<p>List the parts in the order they are used. A typical front-clamp kit might list the holder body, the roll bar or spindle if separate, the clamp set, the clamp screws and a paper or card template. A backed kit might list the body and mounting screws. Anything the installer must supply, such as wall anchors for a backed unit, should be named as &#8220;not supplied.&#8221;<\/p>\n<h3>Templates<\/h3>\n<p>A template speeds marking and reduces cutting errors. If the program packs one, the leaflet should say so and show where to place it. If it does not, the leaflet should say &#8220;use the opening dimensions on the drawing,&#8221; not &#8220;trace the body on paper,&#8221; which tends to give an opening that is too tight or too loose.<\/p>\n<h3>Screws<\/h3>\n<p>Name the screw type and length supplied for each fixing. For clamps, check that the screws reach across the clamp range on the drawing. For backed units, check that they suit the backing material in the sampled wall. Do not print screw lengths that are not in the bag.<\/p>\n<h3>Roll bar or spindle<\/h3>\n<p>If the roll bar is a separate part, include it in the kit list and show how it fits. A spring roller or open-arm design should be shown as supplied, because users often lose the spring during installation.<\/p>\n<h3>Finish protection<\/h3>\n<p>Polished or brushed stainless flanges scratch easily during installation. A protective film or a note to keep the film on until after installation is a simple kit item that reduces damage claims. The leaflet can suggest it without implying a scratch-proof finish.<\/p>\n<h2>What can the install steps say once the kit is named?<\/h2>\n<p>They can describe the path for the named architecture in a short, ordered list, with each figure pointing back to the drawing. Keep each step to one action. Add a stop rule for problems, and name the tools. Avoid promises about time, difficulty or wall types that were not sampled.<\/p>\n<p>For a front-clamp retrofit unit, a leaflet might say: check the wall type and thickness against the drawing; check for pipes, cables and studs behind the chosen position; mark the opening from the template or drawing; cut the opening; test-fit the body; insert the body and tighten the clamp screws evenly until the flange sits flat; fit the roll. Each step should match the parts list.<\/p>\n<p>For a backed new-work unit, a leaflet might say: confirm the backing position before the wall is closed; fix the body to the backing with the screws supplied; fit the wall board around the body; finish the wall; fit the roll. The wall-finishing steps belong to the installer.<\/p>\n<h3>Safety and services<\/h3>\n<p>Before cutting, the installer must check for pipes, cables and fixings behind the wall. The leaflet should say so clearly. It can also note that cutting tools carry their own risks; general guidance from <a href=\"https:\/\/www.osha.gov\/hand-power-tools\" target=\"_blank\" rel=\"noopener nofollow\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">OSHA on hand and power tools<\/a> is a sensible reference for professional installers.<\/p>\n<h3>Placement and height<\/h3>\n<p>Placement height and position relative to the toilet are separate questions. They are covered by the height guides, such as the <a href=\"https:\/\/koitorhardware.com\/fr\/commercial-toilet-paper-holder-height-importer-guide\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">commercial toilet paper holder height guide<\/a>. For public or commercial washrooms, accessibility rules may apply; the <a href=\"https:\/\/www.ada.gov\/law-and-regs\/design-standards\/2010-stds\/\" target=\"_blank\" rel=\"noopener nofollow\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">2010 ADA Standards<\/a> and the <a href=\"https:\/\/www.access-board.gov\/ada\/\" target=\"_blank\" rel=\"noopener nofollow\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">U.S. Access Board<\/a> publish them. The install leaflet should point to the project specification, not set a height itself.<\/p>\n<h3>Tile and stone walls<\/h3>\n<p>Cutting tile, stone or glass panels needs specialist tools and skills. The leaflet should say that these walls require a professional installer and the opening dimensions on the drawing. It should not suggest a drill bit size, cutting method or chip-free result.<\/p>\n<h3>Stop rule<\/h3>\n<p>Tell the installer to stop if the opening is too large for the flange, the clamps do not grip, the body is not level or the wall is thicker or thinner than the drawing allows. Those situations need a check against the drawing, not extra force.<\/p>\n<figure class=\"wp-block-image size-large koitor-blog-image\" style=\"margin:32px 0;\">\n  <img decoding=\"async\" src=\"https:\/\/koitorhardware.com\/wp-content\/uploads\/2026\/11\/BX1125-02-checklist-delivery.webp\" alt=\"Kit audit trays holding a recessed holder body, clamp brackets, screws and template beside a blank checklist\" style=\"width:100%;max-width:960px;height:auto;display:block;margin:0 auto;border-radius:10px;\" \/><figcaption style=\"font-size:14px;color:#667085;text-align:center;margin-top:8px;\">Every part the leaflet mentions should sit in a tray at sample approval, or be marked as not supplied.<\/figcaption><\/figure>\n<h3>Leaflet layout and pictograms<\/h3>\n<p>Keep the leaflet to one page per architecture where possible. Put the architecture name and the kit list at the top, a simple exploded view below, then the numbered steps. Pictograms help across languages: a template on the wall, a cut line, a body pushed into the opening, a screwdriver on a clamp screw. Each pictogram should show the packed parts, not parts from another model.<\/p>\n<p>Avoid tiny text over photos. Installers often read the leaflet on site with dusty hands and poor light. Large step numbers and plain verbs work better than long paragraphs. If the leaflet must carry a warning about services behind the wall, place it before the cutting step, not in a footnote.<\/p>\n<h3>What install complaints reveal<\/h3>\n<p>Returned recessed holders often tell the same story. A clamp unit was fitted into a wall thicker than its range, so the clamps never reached the back of the board. A backed unit was sold to a renter with no access to the cavity. A template was shown but never packed. The opening was cut too large because the installer used the outside of the flange as a guide.<\/p>\n<p>Each of those faults points back to a missing line on the leaflet or kit list, not to the holder itself. Reviewing early complaints against the leaflet is a fast way to improve the next print run. Keep a short log of issues by SKU and update the leaflet revision when a pattern appears.<\/p>\n<h2>When is the question really about cavity, surface mount, removal or loosening?<\/h2>\n<p>Many install questions belong to another file, and the leaflet stays short by routing them. Cavity depth, rough opening and flange overlap belong to the drawing and the cavity specification. Surface-mount brackets belong to the surface-mount guide. Removing or tightening an installed holder belongs to service files.<\/p>\n<p>If an installer asks how deep the wall must be, the answer is on the drawing for that model. The <a href=\"https:\/\/koitorhardware.com\/fr\/recessed-toilet-paper-holder-wall-cavity-specification\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">cavity specification<\/a> page explains how buyers should set and approve those numbers. The leaflet should not repeat a generic depth.<\/p>\n<p>If a buyer asks whether a recessed holder uses the same kit as a wall-mounted one, the answer is no. The <a href=\"https:\/\/koitorhardware.com\/fr\/toilet-paper-holder-installation\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">surface-mount installation guide<\/a> covers plates, templates and anchors for surface units.<\/p>\n<p>If a customer wants to take a holder out, the <a href=\"https:\/\/koitorhardware.com\/fr\/how-to-remove-a-toilet-paper-holder\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">toilet paper holder removal guide<\/a> explains release methods. If the holder has worked loose, <a href=\"https:\/\/koitorhardware.com\/fr\/how-to-fix-a-loose-toilet-paper-holder\/\" style=\"color:#0B5CAD;font-weight:600;text-decoration:underline;text-underline-offset:3px;\">how to fix a loose toilet paper holder<\/a> covers that. Neither is a first-install step.<\/p>\n<h3>Buyer checklist before printing<\/h3>\n<ul>\n<li>The architecture is named at the top of the leaflet.<\/li>\n<li>Every part mentioned is packed or marked &#8220;not supplied.&#8221;<\/li>\n<li>Opening, depth and clamp-range figures come from the drawing with the model reference.<\/li>\n<li>Wall types listed match the wall types the sample was tested in.<\/li>\n<li>The steps follow one architecture at a time.<\/li>\n<li>A services check and a stop rule appear before cutting.<\/li>\n<li>Height and accessibility are routed to the project specification.<\/li>\n<li>Tile and stone walls are routed to a professional installer.<\/li>\n<li>No timed install, no universal cut size, no universal backing rule.<\/li>\n<li>The finish protection note matches the packed film or wrap.<\/li>\n<\/ul>\n<h3>Sample mock-up<\/h3>\n<p>Fit the sample into a mock-up wall of each type listed. Tighten the clamps or fix the screws, fit the roll and check the flange. Record any adjustments to the steps. A mock-up is evidence for that wall type only, not a load rating.<\/p>\n<h3>Sign-off<\/h3>\n<p>The brand approves the wording. The supplier confirms the architecture, the kit and the drawing figures. Koitor can review the leaflet against the drawing and sample and flag mixed architectures or claims that go beyond what was tested.<\/p>\n<h2>Frequently asked questions about recessed holder installation<\/h2>\n<h3>Can a recessed toilet paper holder be installed in an existing wall?<\/h3>\n<p>Yes, if the product is a front-clamp retrofit design and the wall matches the clamp range on its drawing. A backed design needs access to the cavity to fit backing first.<\/p>\n<h3>Do I need backing for a recessed toilet paper holder?<\/h3>\n<p>It depends on the architecture. Clamp designs grip the wall board; backed designs need blocking or a frame. The leaflet for the specific model should say which.<\/p>\n<h3>How big should the opening be?<\/h3>\n<p>The size on the drawing for that model. Openings differ between products, so a size from another holder or a video will not do.<\/p>\n<h3>Can the holder go into a tiled wall?<\/h3>\n<p>Often, but cutting tile needs a professional installer and the drawing&#8217;s opening size. The leaflet should not promise a chip-free cut.<\/p>\n<h3>What if the flange does not sit flat?<\/h3>\n<p>Check that the opening is not oversize, the wall is within the clamp range, and the clamps are tightened evenly. If it still will not sit flat, stop and check the drawing.<\/p>\n<h3>Is a DIY wooden niche the same product?<\/h3>\n<p>No. A niche is a site-built recess. This guide covers manufactured recessed holders with a packed kit.<\/p>\n<h3>Can I install a recessed holder in a shower wall?<\/h3>\n<p>Only where the product is designed for wet areas and the wall system allows it. Shower walls often have waterproof membranes that must not be cut without the system maker&#8217;s method. That is a project decision for the installer, not a leaflet step.<\/p>\n<h3>How long does installation take?<\/h3>\n<p>It depends on the wall, the tools and the installer. The leaflet should not print a time, because a cut in tile takes far longer than a cut in board.<\/p>\n<h3>Does Koitor make recessed toilet paper holders?<\/h3>\n<p>Koitor makes custom metal bathroom hardware, including tissue holders, for OEM programs. Recessed designs are reviewed project by project against drawings and samples.<\/p>\n<h2>Collaborez avec Koitor Hardware<\/h2>\n<section class=\"koitor-blog-cta\" style=\"margin-top:36px;padding:28px;border:1px solid #D0D5DD;border-radius:16px;background:#F8FAFC;\">\n<h3 style=\"margin-top:0;margin-bottom:12px;font-size:28px;line-height:1.25;color:#101828;\">Review a recessed holder install leaflet<\/h3>\n<p style=\"font-size:16px;line-height:1.7;margin-bottom:20px;color:#344054;\">Send the recessed-holder drawing, the clamp or backing architecture you intend to ship, the packed fixing list and any leaflet sentence the program must carry. We can review the wording and the named architecture. We will not issue a cut size, a backing span, a tile-bit size or a timed-install claim.<\/p>\n<div style=\"display:flex;gap:12px;flex-wrap:wrap;align-items:center;margin-bottom:24px;\">\n    <a href=\"https:\/\/koitorhardware.com\/fr\/contact\/\" style=\"display:inline-flex;align-items:center;justify-content:center;min-height:48px;padding:0 22px;border-radius:8px;background:#FF5A1F;color:#ffffff;font-weight:700;text-decoration:none;line-height:1;\">Demander un devis<\/a><br \/>\n    <a href=\"https:\/\/koitorhardware.com\/fr\/fabricant-de-quincaillerie-de-salle-de-bains-sur-mesure\/\" style=\"display:inline-flex;align-items:center;justify-content:center;min-height:48px;padding:0 22px;border-radius:8px;border:1px solid #FF5A1F;color:#FF5A1F;background:#ffffff;font-weight:700;text-decoration:none;line-height:1;\">Bathroom Hardware OEM<\/a>\n  <\/div>\n<div class=\"koitor-article-tags\" style=\"margin-top:24px;padding-top:18px;border-top:1px solid #E5E7EB;display:flex;align-items:center;gap:8px;flex-wrap:wrap;\">\n    <span style=\"font-size:14px;font-weight:700;color:#344054;margin-right:4px;\">Mots-cl\u00e9s :<\/span><br \/>\n    <span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">Accessoires de salle de bains OEM<\/span><span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">Accessoires de salle de bains en marque de distributeur<\/span><span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">Guide d'achat pour les importateurs<\/span><span style=\"display:inline-flex;align-items:center;justify-content:center;padding:6px 12px;border-radius:999px;background:#FFF3ED;color:#FF5A1F;font-size:13px;font-weight:600;line-height:1.2;\">Stainless Steel Bathroom Hardware<\/span>\n  <\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>How to install a recessed toilet paper holder depends on which recessed system the product ships with. Some units clamp into a finished wall opening from the front, some fix to backing placed before the wall is closed, and some offer both. The\u2026<\/p>","protected":false},"author":2,"featured_media":10517,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32],"tags":[40,41,44,57],"class_list":["post-10522","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-importer-buying-guide","tag-importer-buying-guide","tag-oem-bathroom-accessories","tag-private-label-bathroom-accessories","tag-stainless-steel-bathroom-hardware"],"_links":{"self":[{"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/posts\/10522","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/comments?post=10522"}],"version-history":[{"count":0,"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/posts\/10522\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/media\/10517"}],"wp:attachment":[{"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/media?parent=10522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/categories?post=10522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/koitorhardware.com\/fr\/wp-json\/wp\/v2\/tags?post=10522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}