How to Use a 3-Stage Sample Gate to Front-Load OEM Risk (Concept → Engineering → PPS)

Stop “sample good, mass production fails” using must-pass CTQs and an audit-friendly evidence pack at each stage (photos, dimension sheets, test reports), plus PO-ready change control.

MANUFACTURING GUIDE

Koitor

12/29/20251 min read