Planificación de la producción
Plazo de producción y logística
OEM hardware lead time should be separated into product approval, material preparation, fabrication, finishing, inspection, packing and shipment preparation. Combining these into one number hides the decisions that buyers need to control.
Factors that change production timing
New tooling, non-standard material, custom color, complex welding, multiple components, retail packaging and order quantity can extend the schedule. Buyer response time also matters: unresolved drawings, sample changes or late artwork can stop the next stage.
A practical planning sequence
For suitable small-batch projects, samples are commonly planned around 5–7 days and bulk production around 4–6 weeks after confirmation. These are planning references only. The actual quotation should identify what must be approved before timing is committed.
Connect production to logistics
Before completion, confirm carton quantity, dimensions, marks, destination, shipping method and required documents. Allow time for final inspection and cargo release. See the lead-time checklist, the shipping guide y el OEM workflow.
Preguntas frecuentes
Does custom packaging affect lead time?
Yes. Artwork approval, printing and final pack dimensions should be included in the schedule.
Can shipment be booked before production finishes?
Planning can begin earlier, but the booking should reflect realistic completion, inspection and document dates.